Construction Equipment Cost definition

Construction Equipment Cost means the cost of rented or owned equipment, including cost of loading, transportation, unloading, erection, maintenance, fuel, dismantling and removal. This excludes small tools customarily used to carry out the Work by workers and valued at less than $500.00.
Construction Equipment Cost means the cost of rented or owned equipment, including cost of loading, transportation, unloading, erection, maintenance, dismantling and removal.
Construction Equipment Cost means the cost of use of rented or owned construction equipment, including the cost of loading, transporting, unloading, erecting, maintaining, dismantling and removing equipment at the rates under an equipment rates schedule ASAP3 - Schedule 1 - Change Orders - July 3-12 Execution.doc approved in writing by the Province prior to the commencement of work or procurement associated with the Change Order, or in the absence of such a rate schedule, actual cost of invoices by an arm’s length third party;

Examples of Construction Equipment Cost in a sentence

  • Where possible, these rates are based on averages of the cost owning and operating equipment as presented in the Construction Equipment Cost Reference Guide published by PRIMEDIA, Inc.

  • An allowance for General Contractor Overhead & Profit of 10% has been applied to the sum of Labor Cost + Construction Equipment Cost + Material Cost + Engineered Equipment Cost for work performed by the General Contractor.

  • Construction Equipment: Cost will be based at thecurrent Alberta Road Builders & Heavy Construction Rates.

  • The modified MFSAF v2.0 TSS is the summation of all the individual scores, excluding inactivity (0-60 scale).


More Definitions of Construction Equipment Cost

Construction Equipment Cost means the cost of use of rented or owned construction equipment, including the cost of loading, transporting, unloading, erecting, maintaining, dismantling and removing equipment at the rates under an equipment rates schedule approved in writing by the City prior to the commencement of work or procurement associated with the Change Order, or in the absence of such a rate schedule, actual cost of invoices by an arm’s

Related to Construction Equipment Cost

  • CONSTRUCTION EQUIPMENT means all appliances and equipment of whatsoever nature for the use in or for the execution, completion operation or maintenance of the work unless intended to form part of permanent work.

  • Equipment Cost means, for each Unit, the purchase price therefor -------------- paid by the Owner Trustee to the Lessee pursuant to Section 2 of the Participation Agreement and as set forth in Schedule 1 to the Participation Agreement with respect to such Unit. Notwithstanding anything to the contrary contained in the Operative Agreements, the Equipment Cost for any Replacement Unit shall be deemed to be the Equipment Cost or deemed Equipment Cost of the Unit replaced by such Replacement Unit.

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • Replacement Cost means the cost to repair or rebuild the improvements owned by Lessor at the time of the occurrence to their condition existing immediately prior thereto, including demolition, debris removal and upgrading required by the operation of applicable building codes, ordinances or laws, and without deduction for depreciation.

  • Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;

  • Production equipment (1 7 9) means tooling, templates, jigs, mandrels, moulds, dies, fixtures, alignment mechanisms, test equipment, other machinery and components therefor, limited to those specially designed or modified for "development" or for one or more phases of "production".

  • Project Cost means the costs incurred in connection with the

  • Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.

  • The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Full Replacement Cost as used herein shall mean the actual replacement cost of the Leased Property requiring replacement from time to time including an increased cost of construction endorsement, if available, and the cost of debris removal. In the event either party believes that full replacement cost (the then-replacement cost less such exclusions) has increased or decreased at any time during the Lease Term, it shall have the right to have such full replacement cost re-determined.

  • Tenant Inducement Costs shall not include loss of income resulting from any free rental period, it being understood and agreed that Seller shall bear the loss resulting from any free rental period until the Closing Date and that Purchaser shall bear such loss from and after the Closing Date.

  • Direct Cost means a cost not to exceed the cost of labor, material, travel and other expenditures to the extent the costs are directly incurred to provide the relevant assistance or service. “Direct Cost” to the Acquirer for its use of any of a Respondent’s employees’ labor shall not exceed the average hourly wage rate for such employee;

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Field emission equipment means equipment which uses an x-ray tube in which electron emission from the cathode is due solely to the action of an electric field.

  • Public improvement costs means the costs of:

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Contractor’s Equipment means all apparatus, machinery, vehicles and other things required for the execution and completion of the Works and the remedying of any defects. However, Contractor’s Equipment excludes Temporary Works, Employer’s Equipment (if any), Plant, Materials and any other things intended to form or forming part of the Equipment.

  • Customer Premises Equipment or "CPE" means equipment employed on the premises of a Person other than a Carrier to originate, route or terminate Telecommunications (e.g., a telephone, PBX, modem pool, etc.).

  • The Contract Price/ Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Interconnection equipment means a group of components or an integrated system owned and operated by the interconnection customer that connects an electric generator with a local electric power system, as that term is defined in Section 3.1.6.2 of IEEE Standard 1547, or with the electric distribution system. Interconnection equipment is all interface equipment including switchgear, protective devices, inverters or other interface devices. Interconnection equipment may be installed as part of an integrated equipment package that includes a generator or other electric source.

  • Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Contract Cost means the Contract Sum plus Price Variation. This cost shall be included in the letter of acceptance.

  • Replacement Costs means the expenditures for obtaining and installing equipment, accessories or appurtenances which are necessary during the useful life of the treatment works to maintain the capacity and performance for which such works were designed and constructed.

  • Construction Works means all works and things necessary to complete the Project Facilities in accordance with this Agreement;

  • Project Equipment means the items of machinery, equipment or other personal property used in connection with the construction and development of the Project pursuant to the provisions hereof, and all replacements thereof and substitutions therefor made pursuant to this Agreement.