Configuration Beta Test Period definition

Configuration Beta Test Period means: (a) the ** day ** period described in Section (5) of this Amendment; and (b) **day ** described in Section (5) of this Amendment which in total shall not exceed ** days.

Related to Configuration Beta Test Period

  • Relevant Test Period With respect to any Loan, the relevant test period for the calculation of Net Senior Leverage Ratio, Interest Coverage Ratio, Total Net Leverage Ratio or EBITDA as applicable, for such Loan in accordance with the related Underlying Instruments or, if no such period is provided for therein, (i) for Obligors delivering monthly financial statements, each period of the last twelve (12) consecutive reported calendar months, and (ii) for Obligors delivering quarterly financial statements, each period of the last four (4) consecutive reported fiscal quarters of the principal Obligor on such Loan; provided that with respect to any Loan for which the relevant test period is not provided for in the related Underlying Instruments, if an Obligor is a newly-formed entity as to which twelve (12) consecutive calendar months have not yet elapsed, “Relevant Test Period” shall initially include the period from the date of formation of such Obligor to the end of the twelfth (12th) calendar month or fourth (4th) fiscal quarter (as the case may be) from the date of formation, and shall subsequently include each period of the last twelve (12) consecutive reported calendar months or four (4) consecutive reported fiscal quarters (as the case may be) of such Obligor.

  • Applicable Measurement Period means the most recently completed four consecutive fiscal quarters of the Issuer immediately preceding the Applicable Calculation Date for which internal financial statements are available.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Cannabis testing facility means an entity registered by

  • Test Period means, at any time, the four consecutive fiscal quarters of Borrower then last ended (in each case taken as one accounting period) for which financial statements have been or are required to be delivered pursuant to Section 5.01(a) or (b).

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Three-dimensional reference system means a system as described in Appendix 2 to this annex;

  • LCT Test Date shall have the meaning provided in Section 1.12(b).

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • LCA Test Date has the meaning specified in Section 1.03(e).

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Building level or district level leader means an individual employed by the District whose job assignment is that of a building level or district level administrator or an equivalent role, including an administrator licensed by the State Board of Education, an unlicensed administrator, or an individual on an Administrator Licensure Completion Plan. Building level or district level leader does not include the superintendent, deputy superintendents, associate superintendents, and assistant superintendents.

  • Working level month (WLM) means an exposure to 1 working level for 170 hours (2,000 working hours per year divided by 12 months per year is approximately equal to 170 hours per month).

  • Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.

  • Reference evapotranspiration or “ETo” means a standard measurement of environmental parameters which affect the water use of plants. ETo is given expressed in inches per day, month, or year as represented in Appendix C of these Guidelines, and is an estimate of the evapotranspiration of a large field of four to seven-inch tall, cool-season grass that is well watered. Reference evapotranspiration is used as the basis of determining the Maximum Applied Water Allowances.

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Instantaneous flow measurement means the flow measured during the minimum time required for the flow-measuring device or method to produce a result in that instance. To the extent practical, instantaneous flow measurements coincide with the collection of any grab samples required for the same sampling period so that together the samples and flow are representative of the discharge during that sampling period.

  • Development Location Point means a single point selected by the Applicant on the proposed Development site that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development. For a Development which consists of Scattered Sites, this means a single point on the site with the most units that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development.

  • Open type traction battery means a type of battery requiring liquid and generating hydrogen gas released to the atmosphere.

  • Custom Local Area Signaling Service Features (CLASS Features) means certain Common Channel Signaling based features available to End Users, including: Automatic Call Back; Call Trace; Distinctive Ringing/Call Waiting; Selective Call Forward; and Selective Call Rejection.

  • State Level Monitoring Cell means the body constituted by the State Government for the control and elimination of ragging in institutions within the jurisdiction of the State, established under a State Law or on the advice of the Central Government, as the case may be.

  • Certified Remanufacture System or Verified Engine Upgrade means engine upgrades certified or verified by EPA or CARB to achieve a reduction in emissions.

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.