Chehalis Power definition
Examples of Chehalis Power in a sentence
Upon the completion of the preliminary design (including sizing) for each of such municipal water line(s), Chehalis Power will provide WDFW and the CIC with copies of such preliminary design information.
Chehalis Power, its general contractor, and all subcontractors, shall make every reasonable effort to maximize safety for individuals working at the CGF.
Chehalis Power will comply with provisions relating to excavation and erosion control described in Attachment 3 and will require all contractors to comply therewith.
Such sum shall be delivered in trust to the Chehalis Basin Partnership, or to some other organization agreed upon by Chehalis Power, Ecology and the Council for purposes of acquiring and retiring water rights to improve instream flows or flow-related conditions in the Centralia Reach of the Chehalis River.
Chehalis Power will establish an emergency response plan for the CGF to provide employee safety in the event of the following emergencies: on-site chemical release, flood, medical emergency, major power loss, fire, extreme weather, earthquake, volcano, and bomb threat no later than three (3) months prior to operation of the combustion turbines.
Chehalis Power shall designate a person to act as a liaison between EFSEC and Chehalis Power.
Chehalis Power shall report immediately to the Council whenever the air monitoring programs disclose the existence of emergency conditions or conditions that reasonably could lead to a violation of the Prevention of Significant Deterioration (PSD) Permit (Attachment 2).
Chehalis Power shall comply with applicable federal and state safety regulations and local and industrial codes and standards (such as the Uniform Fire Code or those standards administered by the National Boiler Board and Pressure Vessel Inspectors).
Thirty (30) days prior to commencement of construction, Chehalis Power shall submit an overall construction schedule.
Chehalis Power shall fund or provide those traffic control measures or devices along ▇▇▇▇▇▇ Road that are found necessary by EFSEC in accordance with said plan to mitigate such traffic impacts.