Certified Estimate definition

Certified Estimate has the meaning assigned in Section 2.2(e).
Certified Estimate means the final estimate including all anticipated costs to plan, design and construct, and finance a project to convert overhead utility neighborhood distribution lines to underground within a neighborhood. The Certified Estimate will be based on actual conditions within the specified NAP area and based on actual JEA contract unit pricing or recent costs for similar work. The Certified Estimate will include separate estimates from other utilities such as cable television or telephone service, where applicable. The Certified Estimate shall include the cost estimate plus a 25% contingency amount as the ceiling on the amount that could be assessed for each property owner. Other utilities in the City right of way attached to overhead poles, whether such poles are owned by JEA or another utility, are required to provide estimates for a possible conversion project as requested in writing by JEA on behalf of a neighborhood project within 30 days of such request.
Certified Estimate means an estimate developed by a professional architect or engineer licensed under AS 08.48, or by an individual who is qualified to estimate the cost of health care facility equipment, demolition, and construction;

Examples of Certified Estimate in a sentence

  • Table of Contents To the extent the Certified Estimate exceeds $4,900,000, the Exchange Ratio shall be reduced forthwith consistent with Section 2.2(d) and such reduction shall be scheduled at Schedule 2.2(d).

  • RATE SUMMARY SHEET FY 19-20 - 20-21.docx Public Channel and Operations Management $35,355 Government Channel and Operations Management $34,355 Population-Based Rate for Municipalities ($5,500 PER 10,000) Oregon City based on 34,240 population (Certified Estimate US Census 2016) $18,832 Contract 5% increase is associated with facilities overall cost ranging from 3% for lease up to 10% for other increasing operations costs to support facility and employees.

  • To the extent the Certified Estimate exceeds $4,900,000, the Exchange Ratio shall be reduced forthwith consistent with Section 2.2(d) and such reduction shall be scheduled at Schedule 2.2(d).