Seller shall give CEB not less than 7 (seven) Days’ notice of the time it wishes first to synchronise the Facility to the CEB System following successful completion of the Pre- commissioning tests under Schedule H, as certified and notified by the Independent Engineer.
The maximisation of reactive current shall continue until the CEB System voltage recovers to within the normal operational range of the CEB System.
The weekly 95 percentile of Phase (Voltage) Unbalance, calculated in accordance with IEC61000-4-30 and IEC61000-3-13, on the CEB System shall be less than or equal to 1.3% unless abnormal conditions prevail.
The Facility Owner shall give CEB not less than 7 (seven) Days’ notice of the time it wishes first to synchronise the Facility to the CEB System following successful completion of the Pre- commissioning tests under Schedule H, as certified and notified by the Independent Engineer.
The active power output shall be only allowed to increase again as soon as the frequency is only 50.05 Hz. Above 52 Hz and below 47 Hz, the Facility shall be disconnected from the CEB System.
Such protective equipment shall include a disconnecting device to be located between the Facility and the CEB System.
Facility Owner shall provide all available information showing how the predicted behaviour of the dynamic model to be verified with the actual observed behaviour of a prototype or similar PV modules/Inverter under laboratory conditions and / or actual observed behaviour of the real Facility as installed and connected to the CEB System.
The Facility shall be capable of contributing to voltage control by continuous changes to the reactive power supplied to the CEB System.
Seller shall take full responsibility for protection settings, testing and commissioning of the interconnection between the Facility and the CEB System and any changes to settings for CEB equipment affected by the protection settings of Seller’s protection equipment shall be agreed by the Parties.
Seller shall ensure that its employees and contractors comply with the prevailing safety procedures (including in relation to clearing, switching, isolation, testing, earthing and work permits) of CEB, applicable to the CEB System and CEB’s substations, premises, facilities and other equipment as may be notified to Seller by CEB from time to time.