Capacity Check Test Window definition

Capacity Check Test Window has the meaning ascribed to it in Section 15.6(a). “Capacity Confirmation” has the meaning ascribed to it in Section 15.6(c).

Examples of Capacity Check Test Window in a sentence

  • The Supplier shall at the Supplier’s sole cost and expense and within two (2) Business Days after the closing of the Capacity Check Test Window, after completion of the Capacity Check Test prepare and submit to the Buyer a written Capacity Check Test report that includes the data collected during the test period, computation of test data and the test results.

Related to Capacity Check Test Window

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • LCT Test Date shall have the meaning provided in Section 1.12(b).

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • 2 Wire Analog Voice Grade Loop or “Analog 2W” provides an effective 2-wire channel with 2-wire interfaces at each end that is suitable for the transport of analog Voice Grade (nominal 300 to 3000 Hz) signals and loop-start signaling. This Loop type is more fully described in Verizon Technical Reference (TR)-72565, as revised from time-to-time. If “Customer-Specified Signaling” is requested, the Loop will operate with one of the following signaling types that may be specified when the Loop is ordered: loop-start, ground-start, loop- reverse-battery, and no signaling. Customer specified signaling is more fully described in Verizon TR-72570, as revised from time-to- time. Verizon will not build new facilities.

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.

  • LCA Test Date has the meaning assigned to such term in Section 1.06.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Delivery Year means the Planning Period for which a Capacity Resource is committed pursuant to the auction procedures specified in Tariff, Attachment DD, or pursuant to an FRR Capacity Plan under Reliability Assurance Agreement, Schedule 8.1. Demand Bid:

  • Relevant Test Period With respect to any Loan, the relevant test period for the calculation of Net Senior Leverage Ratio, Interest Coverage Ratio, Total Net Leverage Ratio or EBITDA as applicable, for such Loan in accordance with the related Underlying Instruments or, if no such period is provided for therein, (i) for Obligors delivering monthly financial statements, each period of the last twelve (12) consecutive reported calendar months, and (ii) for Obligors delivering quarterly financial statements, each period of the last four (4) consecutive reported fiscal quarters of the principal Obligor on such Loan; provided that with respect to any Loan for which the relevant test period is not provided for in the related Underlying Instruments, if an Obligor is a newly-formed entity as to which twelve (12) consecutive calendar months have not yet elapsed, “Relevant Test Period” shall initially include the period from the date of formation of such Obligor to the end of the twelfth (12th) calendar month or fourth (4th) fiscal quarter (as the case may be) from the date of formation, and shall subsequently include each period of the last twelve (12) consecutive reported calendar months or four (4) consecutive reported fiscal quarters (as the case may be) of such Obligor.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Desired Due Date means the desired service activation date as requested by CLEC on a service order.

  • Delivery Condition has the meaning set forth in Section 2.2(a).

  • Acceptance Condition means the acceptance condition to any Offer;

  • Witness Test means the Company’s right to witness the commissioning testing and/or Company-required Interconnecting Customer-owned communication system. Commissioning testing is defined in IEEE Standard 1547-2003.

  • Check Meter means the Buyer revenue-quality meter section or meter(s), which Buyer may require at its discretion, as set forth in Section 3.08(b) and will include those devices normally supplied by Buyer or Seller under the applicable utility Electric Service Requirements.

  • Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Monthly Remittance Condition has the meaning set forth in Section 4.2 of the Sale and Servicing Agreement.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.