Examples of C12 in a sentence
Pursuant to LA R.S 38:2212.1. C.(1)(2), any manufacturer's preference in this proposal is descriptive, but non-restrictive, and is used only to indicate minimum requirement for type, grade and quality unless otherwise specified.
The permit shield allowed for at 310 CMR 7.00: Appendix C(12) shall not apply to these changes.
C.12 Instrument Specifications [326 IAC 2-1.1-11](a) When required by any condition of this permit, an analog instrument used to measure a parameter related to the operation of an air pollution control device shall have a scale such that the expected maximum reading for the normal range shall be no less than twenty percent (20%) of full scale.
C.12 Instrument Specifications [326 IAC 2-1.1-11] [326 IAC 2-8-4(3)][326 IAC 2-8-5(1)](a) When required by any condition of this permit, an analog instrument used to measure a parameter related to the operation of an air pollution control device shall have a scale such that the expected maximum reading for the normal range shall be no less than twenty percent (20%) of full scale.
C.12 Instrument Specifications [326 IAC 2-1.1-11] [326 IAC 2-7-5(3)] [326 IAC 2-7-6(1)](a) When required by any condition of this permit, an analog instrument used to measure a parameter related to the operation of an air pollution control device shall have a scale such that the expected maximum reading for the normal range shall be no less than twenty percent (20%) of full scale.
PAYMENT D21.1 Further to C12, the City may at its option pay the Contractor by direct deposit to the Contractor’s banking institution.
C-12 security interests, (iii) any Crossed Mortgage Loan, as set forth on Annex A-1 to the Prospectus or (iv) Permitted Encumbrances.
PAYMENT D20.1 Further to C12, the City may at its option pay the Contractor by direct deposit to the Contractor’s banking institution.
C.12 Monitoring Methods [326 IAC 3]Any monitoring or testing performed to meet the applicable requirements of this permit shall be performed according to the provisions of 326 IAC 3, 40 CFR 60, Appendix A, or other approved methods as specified in this permit.
C.12 Monitoring Methods [326 IAC 3] [40 CFR 60] [40 CFR 63]Any monitoring or testing required by Section D of this permit shall be performed according to the provisions of 326 IAC 3, 40 CFR 60, Appendix A, 40 CFR 60, Appendix B, 40 CFR 63, or other approved methods as specified in this permit.