Blower Door Test definition

Blower Door Test means a test to measure air tightness using diagnostic equipment to depressurize the conditioned space. Testing shall be performed by a certified technician.
Blower Door Test means a test to measure air tightness using diagnostic equipment to

Examples of Blower Door Test in a sentence

  • CONTRACTOR will accurately complete and submit Blower Door Test Data Sheets as required by the AGENCY.

  • Third party Air Sealing or Blower Door Test report must be obtained.

  • Preparing for Blower Door Test: Ensure that energy auditor performs following steps to prepare each residential unit for blower door test.

  • This will include Table A (General Data), Table B (H&S/IRM) and then Table C (Photo Checklist) before starting with AIR/DUCT LEAKAGE & VENTILATION T1 – Blower Door Test Data and ending with COMBUSTION APPLIANCE DATA T19 – Dryer.

  • With the Blower Door operating at-50.0 pascal, disconnect the hoses being used for the Blower Door Test (or use a separate gauge) and test the ductwork.

  • OR, collecting Shell Data (espe- cially T9 - Attics) before performing the T1 - Blower Door Test (to ensure that there is no vermic- ulite present in the Attic).

  • There are rows for other areas to be tested if they are identified on the Data Collection Form.o With the Blower Door operating at (or close to) -50.0 pascal, disconnect the hoses being used for the Blower Door Test (or use a separate gauge) and test the areas previously mentioned.o Insert the hose placed into the Attic, Basement/Crawlspace, or Garage onto the Input Tap (up- pertap) of the A side.

  • Blower Door Test and Duct Test have been completed as required and those results are provided in your packet.

  • You will be required to sign adocument stating you will remain in your home 5 years after replacement.Energy Efficiency (EE) ProgramA Blower Door Test will be performed to determine air leakage.

  • Therefore, an appraisal report is not applicable Blower Door Test: Faraday Energy LLC, a certified Home Energy Rater, performed BlowerDoor Testing at the Development on May 30, 2014 and provided a summary of the results.

Related to Blower Door Test

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Cannabis testing facility means an entity registered by

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Plasma arc incinerator means any enclosed device using a high intensity electrical discharge or arc as a source of heat followed by an afterburner using controlled flame combustion and which is not listed as an industrial furnace.

  • Genetic test means an analysis of human DNA, RNA, chromosomes, proteins, or metabolites, that detect genotypes, mutations, or chromosomal changes. The term “genetic test” does not mean an analysis of proteins or metabolites that does not detect genotypes, mutations, or chromosomal changes; or an analysis of proteins or metabolites that is directly related to a manifested disease, disorder, or pathological condition that could reasonably be detected by a health care professional with appropriate training and expertise in the field of medicine involved.

  • Backflow prevention device means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system.

  • Busy Line Verification (BLV means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Backflow Prevention Assembly means any mechanical assembly installed at a water service line or at a plumbing fixture to prevent a backflow contamination event, provided that the mechanical assembly is appropriate for the identified contaminant at the cross connection and is an in-line field-testable assembly.

  • Non-Administrator Substance Use Disorder Treatment Facility means a Substance Use Disorder Treatment Facility that does not meet the definition of an Administrator Substance Use Disorder Treatment Facility.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Septic tank means a water tight tank designed to receive sewage and to effect the adequate decomposition of organic matter in sewage by bacterial action;

  • Aquatic invasive species means any invasive, prohibited,

  • explosive actuated fastening device means a tool that is activated by an explosive charge and that is used for driving bolts, nails and similar objects for the purpose of providing fixing;

  • Stand-Alone Test Environment or "SATE" shall have the meaning set forth in Section 12.2.9.3.2.

  • Electrostatic spray means a method of applying a spray coating in which opposite electric charges are applied to the substrate and the coating. The coating is attracted to the substrate by the electrostatic potential between them.

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • Busy Line Verification (BLV) means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Low-level radioactive waste or “waste” means radioactive material that consists of or contains class A, B, or C radioactive waste as defined by 10 C.F.R. 61.55, as in effect on January 26, 1983, but does not include waste or material that is any of the following: