BDFB definition
Examples of BDFB in a sentence
If CLEC orders sixty (60) amps or less, the power feed typically terminates at a battery distribution fuse board (BDFB).
DC Power Reduction With Reservation allows CLEC to reserve a fuse or breaker position on the power board or battery distribution fuse board (BDFB) when reducing a secondary power feed to zero.
Determination of the BellSouth BDFB or BellSouth power board as the power source will be made at BellSouth’s sole, but reasonable, discretion.
DC Power Off allows CLEC to deactivate their secondary power feed and remove it from the power distribution point (e.g., BDFB or power board).
This category of approval does not include access to common areas, installation of cabling outside of the cage or footprint, virtual collocation areas, the MDF or the BDFB power distribution areas.
The determination of the BellSouth BDFB or BellSouth power board as the power source will be made at BellSouth’s sole, but reasonable, discretion.
CLEC-1 is responsible for contracting with a BellSouth Certified Supplier for power distribution feeder cable runs from a BellSouth BDFB or power board to CLEC-1’s equipment.
BellSouth will provide the common power feeder cable support structure between the BellSouth BDFB or power board and ALEC Inc.,’s arrangement area.
Recurring power charges begin on the Space Ready Date , or on the date ALEC Inc., first occupies the Collocation Space, whichever is sooner.When obtaining power from a BDFB, fuses and power cables (A&B) must be engineered (sized), and installed by ALEC Inc.,’s BellSouth Certified Supplier.
The DC power charge per amp consists of the use of: DC power plant, backup generator, batteries & rectifiers, BDFB, associated hardware and cabling, and AC energy to convert to DC power.