Basement Plan definition

Basement Plan means the plan in Item 1 of the First Schedule;
Basement Plan means the plan in Item 1 of the First Schedule; “Basement Reserve” means that part of the Reserved Land comprised in the

Examples of Basement Plan in a sentence

  • Thus, a typical sequence might be: Basement Plan, First Floor Plan, First Floor Reflected Ceiling Plan, Second Floor Plan, Attic Plan, Roof Plan.

  • E Proposed Basement Plan 823-S.04 Rev D Proposed Ground Floor Plan 823-S.05 Rev.

  • A revised Proposed Basement Plan (APL006 Rev I) was prepared by the applicant reconfiguring the disabled spaces at Basement Level, so that these are located towards the entrance of Building 3, with a minimum headroom of 2.6 metres.

  • It will be placed on a new concrete foundation which includes a full basement, as identified on the Site Plan and Basement Plan on pages A-11 and A-12 of this Agreement.

  • Nonetheless the revised Basement Plan submitted to the LPA on 26 August 2020 shows an increased provision for the storage of bins at basement level.

  • All short-stay spaces will be incorporated in the public square and all long-stay spaces will be provided at basement level (see Basement Plan) in lockable rooms, apart from seven spaces for commercial units that will be provided at ground floor level: Draft London Plan policy has a higher cycle parking standard but this has limited weight at this stage (see London Plan Policy T5: Cycling and Table 10.2).

  • March 1927, 243; Munch, Minnequa Works Office Building National Register nomination, 15 and 18; Main Office Annex, 1945 Extension, Basement Plan and First Floor Slab and Beams, drawing, reference number 39861, Steelworks Center of the West Archives, Pueblo, Colorado.

  • Before first occupation of the approved development, the new access and parking areas serving the development shall be completed in accordance with the approved in principle plans , drawing numbers GA 302 PL Revision 3 'Ground Floor plan and GA 301 PL Revision 3 'Basement Plan'.

  • Plans set includes:Cover Sheet, Basement Plan, Ground Floor Plan, Second Floor Plan, Elevations, Dimensional Form, Ownership affidavit, Copy of BZA Application and attachments.

  • The electric vehicle charge points and associated infrastructure as detailed in and as shown on drawing numbers 17024_07_099 (Basement Plan) and 17024_07_109 (Houses) shall be installed prior to use of the development hereby permitted and maintained thereafter.

Related to Basement Plan

  • Basement means any area of the building having its floor subgrade (below ground level) on all sides.

  • Pest Management Plan and “PMP” means the Recipient’s plan dated December 13, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Flexible vinyl adhesive means an aerosol adhesive designed to bond flexible vinyl to substrates. Flexible vinyl means a nonrigid polyvinyl chloride plastic with at least five percent, by weight, of plasticizer content. A plasticizer is a material, such as a high boiling point organic solvent, that is incorporated into a vinyl to increase its flexibility, workability, or distensibility, and may be determined using ASTM Method E260-91 or from product formulation data.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Erosion and sediment control plan means a comprehensive plan developed to address pollution caused by erosion and sedimentation of soil particles or rock fragments during construction.

  • Uppermost aquifer means the geologic formation nearest the natural ground surface that is an aquifer, as well as lower aquifers that are hydraulically interconnected with this aquifer within the facility's property boundary.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Permeable pavement means paving material that absorbs water or allows water to infiltrate through the paving material. "Permeable pavement" materials include porous concrete, permeable interlocking concrete pavers, concrete grid pavers, porous asphalt, and any other material with similar characteristics.

  • Sediment means solid material, mineral or organic, that is in suspension, is being transported, or has been moved from its site of origin by air, water or gravity as a product of erosion.

  • Double Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in two or more distinct phases that requires the product container be shaken before use to mix the phases, producing an emulsion.

  • Negative pressure respirator (tight fitting) means a respirator in which the air pressure inside the facepiece is negative during inhalation with respect to the ambient air pressure outside the respirator.

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.

  • Lateral Access Roads has the meaning given in subclause (3)(a)(iv));

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Underground storage tank system means an underground storage tank and the connected underground piping, underground ancillary equipment, and containment system, if any.

  • Security Management Plan means the Supplier's security management plan prepared pursuant to paragraph 3 of schedule 2 an outline of which is set out in paragraph 2.7 of the Order Form as updated from time to time;

  • Large municipal separate storm sewer system means all municipal separate storm sewers that are either:

  • Sewage sludge weight means the weight of sewage sludge, in dry U.S. tons, including admixtures such as liming materials or bulking agents. Monitoring frequencies for sewage sludge parameters are based on the reported sludge weight generated in a calendar year (use the most recent calendar year data when the NPDES permit is up for renewal).

  • Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.

  • Underground storage tank or “UST” means any one or combination of tanks (including underground pipes connected thereto) that is used to contain an accumulation of regulated substances, and the volume of which (including the volume of underground pipes connected thereto) is 10 percent or more beneath the surface of the ground. This term does not include any: