Examples of Baseload Product in a sentence
For Seller selling Baseload Product, Seller shall be excused from achieving the Guaranteed Energy Production and the Capacity Factor only for the applicable time period during Seller Excuse Hours.
Seller shall transfer the Renewable Energy Credits to Buyer even if Buyer does not accept and/or pay for the underlying energy per Section 3.1(f) or for Baseload Product only, pays something other than the Contract Price.
Such log shall include information on power production, [fuel consumption,][Bracketed language for applicable Baseload Product only] efficiency, availability, maintenance performed, outages, results of inspections, manufacturer recommended services, replacements, electrical characteristics of the generators, control settings or adjustments of equipment and protective devices.
Seller shall transfer the Renewable Energy Credits to Buyer even if Buyer does not accept and/or pay for the underlying energy per Section 3.1(f) or for Baseload Product only, pays less than the Contract Price for Delivered Energy per Section 4.6(c).
For Baseload Product, the capacity forecasted in the Day-Ahead Availability Notice will be the scheduled output of the Project.
In contrast to Baseload Product, the Seller does not control the availability of fuel supply to the Project producing As-Available Product and lacks the ability to store energy and control the rate of output.
Guaranteed Energy Production is described by the following formula:Guaranteed Energy Production = (160% × average of the Contract Quantities in MWh in Performance Measurement Period) × [(Hrs in Performance Measurement Period – Seller Excuse Hrs in Performance Measurement Period) / Hrs in Performance Measurement Period] [Use the following bracketed language for Baseload Product only] [(ii) Guaranteed Energy Production.
Such log shall include, but not be limited to, information on power production, [fuel consumption,] [Bracketed language for applicable Baseload Product only] efficiency, availability, maintenance performed, outages, results of inspections, manufacturer recommended services, replacements, electrical characteristics of the generators, control settings or adjustments of equipment and protective devices.
Length of Delivery Term (in Contract Years): 1For a Baseload Product, the minimum qualifying Contract Quantity should be equivalent to at least an eighty percent (80%) Capacity Factor.
In contrast to Baseload Product, the Seller does not control the availability of fuel supply to the Project producing As-Available Product and lacks the ability to store energy and control the rate of output.1.10 “Availability Workbook” has the meaning set forth in Appendix IX.