Assembly Plan definition

Assembly Plan means an assembly plan set forth in the Operating Plan, as more particularly described in Section 11.6(A)(2) of this Agreement.
Assembly Plan means an assembly plan set forth in the Operating Plan, as more particularly described in Section 11.6(A)(2) of this Agreement. “Associated Assets” means, with respect to any Fab, the Joint Venture Equipment, inventory and other tangible personal property owned by the
Assembly Plan means the technological document for the international freight process approved by the Authorities, on the basis of which the use of the railway infrastructure in international traffic of freight trains is determined.

Examples of Assembly Plan in a sentence

  • Concept Tower Design Report (Draft and Final) • Conceptual Manufacturing and Assembly Plan (Draft and Final) • Turbine Scaling Study Report (Draft and Final) • Risk Management Report (Draft and Final) • Load Table for Basis of Design • Preliminary Tower Design Report (Draft and Final) • LCOE Report (Draft and Final) • CPR Report #1 The goal of this task is to develop sustainable solutions for the next generation 3DCP-based tall tower technologies that consider a closed-loop cycle approach.

  • The Site Assembly Plan will contain details of, The grain and grade(s), The location of the commodity(s), and The method of accumulation of the cargo tonnage.

  • Site Assembly Plan (SAP).This has the meaning given in Part C clause 25.

  • Site Assembly Plan (SAP).This has the meaning given in clause 25.

  • Cargo Assembly Planning – Site Assembly Plan The customer will work with GrainCorp Logistics and will be required to compile the detailed content of a Site Assembly Plan (SAP) prior to commencement of accumulation of a cargo tonnage at the nominated Port Terminal at any time from the date on which the customer is notified of its Assigned Load Date (Part C clause 9), up to, but no later than, and twenty-eight days (28) before the Assigned Load Date (Part C clause 16).

  • Review and consultation with the respective Members under each of the Applicable Joint Venture Agreements and the respective Board of Managers of the Applicable Joint Ventures, as appropriate, of such Applicable Joint Venture’s monthly updates and reports of performance compared to the Operating Plan (including the Manufacturing Plan, Assembly Plan and Test Plan) under its Applicable Joint Venture Agreement and performance compared to the ramp plan.

  • Cargo Assembly Planning – Site Assembly Plan The customer will work with GrainCorp Logistics and will be required to compile the detailed content of a Site Assembly Plan (SAP) prior to commencement of accumulation of a cargo tonnage at the nominated Port Terminal at any time from the date on which the customer is notified of its Assigned Load Date (Part C clause 9), up to, but no later than, and twenty-eight days (28) before the Assigned Load Date (Part C clause 1617).