As-Built Condition definition

As-Built Condition means the amenities and alterations that have been built in Fairview Park as of the effective date of this ordinance.
As-Built Condition means the dwelling units, office and other nonresidential units, buildings and baseline traffic conditions existing at the time Costa Mesa issues the notice of preparation of an environmental impact report for the Major Change in Allowable Land Use, or, where no such notice is issued, on the date the application for the Major Change in Allowable Land Use is deemed complete. Illegal dwellings and other conditions that exist in violation of Costa Mesa’s zoning ordinance and are subject to Costa Mesa’s power of abatement, shall not be accounted for in the As-Built Condition for the purpose of determining a “Significant Increase,” as defined in subdivision (h) below.
As-Built Condition means the dwelling units, office and other nonresidential units, buildings and baseline traffic conditions existing at the time the city issues the notice of preparation of an environmental impact report for the major change in allowable land use, or, where no such notice is issued, when the city commences environmental analysis for the major change. Illegal dwellings and other conditions that exist in violation of the city’s zoning ordinance or its local coastal program and are subject to the city’s power of abatement, may not be accounted for in the as built condition for the purpose of determining a “significant increase,” as defined in subdivision (c) below.

Examples of As-Built Condition in a sentence

  • As-Built Condition - The physical, chemical, and biological characteristics of a Candidate WCB Site after complete implementation of a development plan.

Related to As-Built Condition

  • Step Down Conditions As of any Distribution Date on which any decrease in any Senior Prepayment Percentage may apply, (i) the outstanding Principal Balance of all Mortgage Loans 60 days or more Delinquent (including Mortgage Loans in REO and foreclosure), averaged over the preceding six month period, as a percentage of the aggregate of the Class Certificate Principal Balances of the Classes of Subordinate Certificates on such Distribution Date, does not equal or exceed 50% and (ii) cumulative Realized Losses with respect to all of the Mortgage Loans do not exceed: · for any Distribution Date on or after the seventh anniversary until the eighth anniversary of the first Distribution Date, 30% of the aggregate Certificate Principal Balance of the Subordinate Certificates as of the Closing Date, · for any Distribution Date on or after the eighth anniversary until the ninth anniversary of the first Distribution Date, 35% of the aggregate Certificate Principal Balance of the Subordinate Certificates as of the Closing Date, · for any Distribution Date on or after the ninth anniversary until the tenth anniversary of the first Distribution Date, 40% of the aggregate Certificate Principal Balance of the Subordinate Certificates as of the Closing Date, · for any Distribution Date on or after the tenth anniversary until the eleventh anniversary of the first Distribution Date, 45% of the aggregate Certificate Principal Balance of the Subordinate Certificates as of the Closing Date, and · for any Distribution Date on or after the eleventh anniversary of the first Distribution Date, 50% of the aggregate Certificate Principal Balance of the Subordinate Certificates as of the Closing Date.

  • Normal Operating Conditions means those Service conditions which are within the control of Grantee. Those conditions which are not within the control of Grantee include, but are not limited to, natural disasters, civil disturbances, power outages, telephone network outages, and severe or unusual weather conditions. Those conditions which are ordinarily within the control of Grantee include, but are not limited to, special promotions, pay-per-view events, rate increases, regular peak or seasonal demand periods, and maintenance or upgrade of the Cable System.

  • As-Built Drawings and Specifications. A CADD-DXF file on CD-ROM, pdf versions of the drawings on CD-ROM, and a set of “Xerox” type blackline on bond prints of all “as-built” drawings and specifications of the Premises (reflecting all field changes and including, without limitation, architectural, structural, mechanical and electrical drawings and specifications) prepared by Tenant’s Architect and Engineers or by Contractors (defined below) shall be delivered by Tenant at Tenant’s expense to the Landlord within thirty (30) days after completion of the Tenant Work. If Landlord has not received such drawings and CD-ROM(s) within thirty (30) days, Landlord may give Tenant written notice of such failure. If Tenant does not produce such drawings and CD-ROM(s) within ten (10) days after Landlord’s written notice, Landlord may, at Tenant’s sole cost which may be deducted from the Allowance, produce such drawings and CD-ROM(s) using Landlord’s personnel, managers, and outside consultants and contractors. Landlord shall receive an hourly rate reasonable for such production.

  • Standard Conditions means the “International Bank for Reconstruction and Development and International Development Association Standard Conditions for Grant Financing Made by the Bank out of Trust Funds”, dated February 25, 2019.

  • Unsafe condition as used in this clause means the actual or potential exposure of contractor or Government employees to a hazardous material as defined in Federal Standard No. 313, and any revisions thereto during the term of this contract, or any other material or working condition designated by the Contracting Officer's Technical Representative (COTR) as potentially hazardous and requiring safety controls.