ARHM definition
Examples of ARHM in a sentence
Projects consisted of lowering the utilities (manholes, water valves, etc.) prior to grind, Glasspave 25 install prior to overlay, 2” grind and overlay with ARHM with rock dust blotter application prior to opening traffic to prevent tracking and tire adhesion delamination, and 2 coats of striping.
Our soils and materials testing services will typically include the following: ° Field observation, documentation, sampling and testing of compacted fill, utility trench backfill, wall backfill, subgrade, aggregate base, asphalt concrete (AC) and asphalt rubberized hot mix (ARHM) materials.
Testing of HMA/ ARHM and Placement Observation – Review mix design, observe and perform testing for construction activities including but not limited to subgrade preparation and recompaction of soft areas, placement of aggregate base, and placement of asphalt hot mix base course and re-compaction, and ARHM surfacing or final HMA cap paving and compaction.
Testing of HMA/ ARHM and Placement Observation – Review mix design, observe and perform testing for construction activities including but not limited to subgrade preparation and re- compaction of soft areas, placement of aggregate base, and placement of asphalt hot mix base course and re-compaction, and ARHM surfacing or final HMA cap paving and compaction.