Area Load Dispatch Centre definition

Area Load Dispatch Centre means the area load dispatch center located in ESCOMs.

Examples of Area Load Dispatch Centre in a sentence

  • Mike collaborates with business, local government agencies,associations, unions and education entities to develop and administer industry-driv- en training programs as a solution for businesses to recruit, train, and retain highly- skilled workers.

  • Therefore, for the period prior to Oct.’12, the generation from Rithala in Open and Close Cycle Mode has to be considered as recorded by Area Load Dispatch Centre (ALDC) of the Petitioner.

  • Apart from it, audit work of State Load Dispatch Centre (SLDC), Airoli, Navi Mumbai will be awarded to the Auditor of Vashi Zone and audit work of Area Load Dispatch Centre (ALDC), Ambazari, Nagpur will be awarded to the Auditor of Nagpur Zone.

  • Area Load Dispatch Centre (ALDC) under the PGVCL has been operating at Jetpur, district Rajkot.

  • Note that the constraint on the maximum wire width is imposed by the available routing resource.

  • Electricity generated from Power Projects based on USW, shall be metered on 15-minute time block by State Transmission Utility (STU) / Distribution Licensee / State Load Dispatch Centre (SLDC) / Area Load Dispatch Centre (ALDC) at the receiving end of GETCO - STU substation /11 KV system of Distribution Licensee as the case may be.2. For the purpose of energy accounting, such Projects shall provide ABT-compliant meters at the interface points.9.Sale of Electricity to Obligated Entities1.

  • The SPGs shall also provide and maintain at its own cost, requisite facilities for transfer of real time data of the power plant to State or Area Load Dispatch Centre as per the requirements of PSPCL, PSTCL and SLDC and comply with forecasting and scheduling regulations as applicable to the project.31.Commissioning of Solar Power Plant: - The selected SPG shall commission the solar power plant within 9 months from date of signing of PPA.

  • Apart from it, audit work of Maharashtra State Load Dispatch Centre (MSLDC), Airoli, Navi Mumbai will be awarded to the Auditor of Vashi Zone and the audit work of Area Load Dispatch Centre (ALDC), Ambazari, Nagpur will be awarded to the Auditor of Nagpur Zone.

  • Area Load Dispatch Centre (ALDC) under the UGVCL has been operating at Gandhinagar.

Related to Area Load Dispatch Centre

  • State Load Despatch Centre or ”SLDC” means the centre established by the State Government for the purpose of exercising the powers and discharging the functions under Section 31 of the Act;

  • Transboundary movement means any movement of hazardous wastes or other wastes from an area under the national jurisdiction of one State to or through an area under the national jurisdiction of another State or to or through an area not under the national jurisdiction of any State, provided at least two States are involved in the movement;

  • Peak-Hour Dispatch means, for purposes of calculating the Energy and Ancillary Services Revenue Offset under Tariff, Attachment DD, section 5, an assumption, as more fully set forth in the PJM Manuals, that the Reference Resource is committed in the Day-Ahead Energy Market in four distinct blocks of four hours of continuous output for each block from the peak-hour period beginning with the hour ending 0800 EPT through to the hour ending 2300 EPT for any day when the average day-ahead LMP for the area for which the Net Cost of New Entry is being determined is greater than, or equal to, the cost to generate (including the cost for a complete start and shutdown cycle) for at least two hours during each four-hour block, where such blocks shall be assumed to be committed independently; provided that, if there are not at least two economic hours in any given four-hour block, then the Reference Resource shall be assumed not to be committed for such block; and to the extent not committed in any such block in the Day- Ahead Energy Market under the above conditions based on Day-Ahead LMPs, is dispatched in the Real-Time Energy Market for such block if the Real-Time LMP is greater than or equal to the cost to generate under the same conditions as described above for the Day-Ahead Energy Market. Peak Market Activity:

  • Data Centre or "DC" means the primary centre where data, software, computer systems and associated components, such as telecommunication and storage systems, redundant or backup power supplies, redundant data communications, environment controls and security devices are housed and operated from;

  • Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.

  • Modular building means, but shall not be limited to, single and multifamily houses, apartment

  • travel distance means the distance an occupant has to travel to reach an exit.

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Study Centre means a centre established and maintained or recognized by the University for the purpose of advising, counselling or for rendering any other assistance required by the students in the context of distance education;

  • Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.

  • Demarcation Point means the point where Qwest owned or controlled facilities cease, and CLEC, End User Customer, premises owner or landlord ownership or control of facilities begin. "Designed, Verified and Assigned Date" or "DVA" means the date on which implementation groups are to report that all documents and materials have been received and are complete.

  • Modular building retailer means any person who purchases or acquires a modular building from a

  • Electrical Distance means, for a Generation Capacity Resource geographically located outside the metered boundaries of the PJM Region, the measure of distance, based on impedance and in accordance with the PJM Manuals, from the Generation Capacity Resource to the PJM Region.

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.

  • Office of the Interconnection Control Center means the equipment, facilities and personnel used by the Office of the Interconnection to coordinate and direct the operation of the PJM Region and to administer the PJM Interchange Energy Market, including facilities and equipment used to communicate and coordinate with the Market Participants in connection with transactions in the PJM Interchange Energy Market or the operation of the PJM Region. On-Site Generators:

  • the trunk road means the A590 Trunk Road;

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • manoeuvring area means that part of an aerodrome to be used for the take-off, landing and taxiing of aircraft, excluding aprons;

  • LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Suction outlet means the opening or fitting through which the water under negative pressure is drawn from the pool or spa.

  • Antenna coating means a coating labeled and formulated exclusively for application to equipment and associated structural appurtenances that are used to receive or transmit electromagnetic signals.

  • Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.

  • Locational Deliverability Area or “LDA” shall mean a geographic area within the PJM Region that has limited transmission capability to import capacity to satisfy such area’s reliability requirement, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, and as specified in Reliability Assurance Agreement, Schedule 10.1.

  • Rack means a mechanism for delivering motor vehicle fuel or diesel from a refinery or terminal into a truck, trailer, railroad car, or other means of non-bulk transfer.

  • Ambient air means that portion of the atmosphere, external to buildings, to which the general public has access.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.