Approved for Construction definition

Approved for Construction means the Design Documents have been reviewed, approved, and are ready to be utilized for construction purposes. All vendor and supplier information is final and no further engineering is required to install the {SOLARModules/WINDWTGs}, the Infrastructure Facilities, Equipment and Materials and any other part of the Project.
Approved for Construction means a design that has been prepared, checked and approved in accordance with the contract requirements, relevant standards including any railway standards, requirements, guidelines and comments.
Approved for Construction means Commercial Projects in which (i) the Project Entity has been formed and has entered into a sublicense agreement with the Company, (ii) the Project Entity has paid the initial installment due under the Amended KFx License or the Amended Series A and B License, (iii) the board of directors of KECC, if KECC or a KECC Affiliate is participating in the project, or the board of directors of KFx, if KFx or a KFx Affiliate is participating in the project, shall have given final approval for the initial funding necessary for construction of the Commercial Project by resolution or by written consent and (iv) where a formal public announcement pursuant to such board approval has been made by KECC or KFx, as the case may be, of the decision to proceed with such project.

Examples of Approved for Construction in a sentence

  • All required improvements and the construction and installation of such improvements shall be in accordance with the Approved for Construction Drawings, plans and specifications approved by the City, and in accordance with applicable provisions of the City of Fruita's Design Criteria and Construction Specifications Manual and Title 17 of the Fruita Municipal Code.

  • Such wastewater collection system shall be constructed in accordance with the Approved for Construction Drawings, plans and specifications, and City wastewater system regulations.

  • All required improvements and the construction and installation of such improvements shall be in accordance with the Approved for Construction Drawings, plans and specifications and as approved by the Ute Water Conservancy District.

  • Prior to the release of the project for construction (Notice to Proceed), digital copies of the Approved for Construction Drawings must be provided to the KC Water project manager.

  • If the final submission of Tenant's architectural drawings are stamped "Final Approved for Construction as Noted," it is Tenant's or Tenant's representative's responsibility to distribute copies of the final drawings, stamped as such, to the contractors at the job site.

  • Engineer shall issue from time to time free of charge two sets of Contract Drawings, Approved for Construction, to the Contractor and one copy thereof to the Employer.

  • Developer shall install the following off-site wastewater collection system components in accordance with the Approved for Construction Drawings: N/A .

  • Upon acceptance of our proposal the Owner must provide at least (4) sets of "Approved for Construction" drawings and CAD file.

  • Developer shall install the following off-site wastewater collection system components in accordance with the Approved for Construction Drawings: not applicable.

  • Definition Description Detail Design Process to develop and issue Approved for Construction documents and drawings in accordance with the Design Base, including Quality Control, Quality Assurance, and Change Management.


More Definitions of Approved for Construction

Approved for Construction specifications and drawings to maintain the schedule of Work, but shall not perform any Work in the areas or sections marked “HOLD” on “Approved for Construction” specifications and drawings until revised “Approved for Construction” specifications and drawings are received with the “HOLD” markings deleted.