Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.
tidal work means so much of any work authorised by this Order as is on, under or over tidal waters or tidal lands below the level of high water;
Improvement completion assurance means a surety bond, letter of credit,
Major Work means any Work to Construct or Maintain the Distribution System that costs more than One Hundred Thousand ($100,000.00) Dollars;
Project Improvements means site improvements and facilities that are:
Construction Work means any work in connection with⎯
Tenant Improvements Defined in Exhibit B, if any.
Project Work means the work required to complete the Project.
Plans and Specifications means the plans, drawings and specifications reasonably necessary to properly assess and review proposed Work prior to issuance of any approval that may be required under this Agreement;
aerial work means an aircraft operation in which an aircraft is used for specialised services such as agriculture, construction, photography, surveying, observation and patrol, search and rescue, and aerial advertisement;
IRB approval means the determination of the IRB that the research has been reviewed and may be conducted at an institution within the constraints set forth by the IRB and by other institutional and federal requirements.
Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;
Development Consent means the consent granted to the Development Application for the Development and includes all modifications made under section 4.55 of the Act.
Tenant’s Work means all improvements, alterations, fixture, equipment, and signage installation, and furniture placement necessary or appropriate for the conduct of the Permitted Use, including all work described as Tenant’s Work on Exhibit D, attached (the “Work Letter”).
Development Work means the conduct of preclinical and clinical trials, the compilation of the regulatory dossier concerning Licensed Products and the conduct of other work necessary or useful for obtaining Regulatory Approval of Licensed Products.
demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;
Works Approval means this Works Approval numbered W5894/2015/1 and issued under the Act; and
Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.
Approval Application means a BLA, NDA or similar application or submission for a Product filed with a Regulatory Authority in a country or group of countries to obtain marketing approval for a biological or pharmaceutical product in that country or group of countries.
MAA Approval means approval by the EMEA of a marketing authorization application (“MAA”) filed with the EMEA for the applicable Licensed Product under the centralized European procedure. If the centralized EMEA filing procedure is not used, MAA Approval shall be achieved upon the first Approval for the applicable Licensed Product in any two of the following countries: France, Germany, Italy, Spain or the United Kingdom.
Development approval means any written authorization from a
Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.
construction work permit means a document issued in terms of regulation 3; "contractor" means an employer who performs construction work;
Approval Letter means the letter from WRAS to the Applicant confirming the grant of WRAS Approval in respect of a Product;
Construction project means the same as that term is defined in Section 38-1a-102.
Urgent Work means any urgent measures which in the opinion of Engineer-in-charge become necessary during the progress of the work to obviate any risk of accident or failure or disruption of generation which become necessary for security.