Alternative design definition
Examples of Alternative design in a sentence
ES ES FR FR GB GB HK HK IL IL IT IT JP JP KR KR NL NL NZ NZ SE SE US US +1div US US 8/02/2000 8/02/2020 8/02/2020 14/07/1999 Itamar Medical (CM) 1997 LTD A variation of the basic PAT probe for improved signal to noise performance.(Uses a 3 compartment design, where middle compartment has inherent noise cancelling characteristics) (Alternative design, better signal to noise) Probe devices particularly useful for non-invasive detection of medical condition.
Alternative design solutions may also be required, such as value engineering or scope reduction.
Alternative design requests require NBU approval and customer is responsible for any additional fees.
Alternative design concepts will be based on the integration of concepts from the Phase I Lincolnway Placemaking effort.
Alternative design treatments may be considered by the director provided the design treatments provide visual interest to the pedestrian.
Alternative design codes may be proposed for review by the Grantor under Clause 13, providing that the requirements in relation to a service life of 75 years are equal to or better than those referenced under Schedule 21 (Technical Standards) or the report prepared by Dessau Soprin dated May 2000.
Alternative design standards for all structures may be utilized upon review and approval by the Director of Development Services at the time of site planning.
This would conflict with the project objective of developing the campus "with sufficient building height and density to provide usable public open space among the buildings that connects to the improved waterfront edges of the site." Also, as discussed above, the Existing Zoning Alternative design calls for smaller buildings spread throughout the Project site that conform to the existing height limitations of 30 feet along the Bayshore and 50 feet along ▇▇▇▇▇▇▇ Channel.
Key words: Alternative design, Conforming design, Competitive tender Address: ▇.▇▇▇▇, ▇-▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇-▇▇, ▇▇▇▇▇ ▇▇▇▇▇ 179-8903 To achieve the objective of reduced construction cost, the principle strategy will be generally to find ways of using less materials to achieve equivalent performance, particularly in the viaduct deck.
By ‘Changes and additions’ is meant: Alternative design or function, other than that previously agreed, decided or reported by the parties, requested by the tenant, or a notice leading to a change in duration and/or cost.