All generating facilities definition
Examples of All generating facilities in a sentence
All generating facilities must obtain an electrical permit and pass electrical inspection before they can be connected or operated in parallel with the PUD’s electric system.
All generating facilities must obtain an electrical permit and pass electrical inspection before they can be connected or operated in parallel with the District's electric system.
All generating facilities in the NEPOOL Control Area that are subject to central dispatch pursuant to Section 13 of the NEPOOL Agreement.
All generating facilities, batteries and all types of storage devices must immediately disconnect from Kaysville City’s distribution system upon any and all power outages on Kaysville City’s distribution system (line Side).
All generating facilities must obtain an electrical permit and pass electrical inspection before they can be connected or operated in parallel with the Utility's electric system.
All generating facilities must comply with these guidelines to be eligible for interconnection and parallel operation with MEA’s system regardless of whether the applicant intends to generate energy to serve all or part of the applicant’s load or to sell the entire output to MEA.
All generating facilities must obtain an electrical permit and pass electrical inspection before they can be connected or Operated in Parallel with PL&WCo’s Electric System.
All generating facilities must obtain an electrical permit and pass electrical inspection before they can be connected or operated in parallel with the Town of Steilacoom electric system.