AGC Set-Point definition

AGC Set-Point means the Company-generated analog or digital signal sent by the SCADA System to the Facility, representing the quantity of Renewable Energy to be generated by the Facility. The AGC Set-Point is calculated by the EMCC AGC system and communicated electronically to the Facility via the SCADA System.
AGC Set-Point means an analog or digital signal updated every four (4) seconds sent to the Facility by PacifiCorp, the Interconnection Provider, the Transmission Provider or the Market Operator with respect to the Facility operations using AGC.
AGC Set-Point means the analog or digital signal sent to the Facility by PacifiCorp, the Interconnection Provider, the Transmission Provider or the Market Operator representing the maximum Net Output for the Facility.

Examples of AGC Set-Point in a sentence

  • The following data points will be transmitted via SCADA from Seller to EPE and represent Facility level data: AGC Set-Point (echo) MW Actual power MW Park Potential MW AGC Status Remote/Local The following protocols outline the expectations for responding to the AGC Set-Point.

  • Seller shall maintain the Facility’s SCADA System and communications systems so that they are capable of interfacing with and reacting to EPE’s AGC Set-Point and responding to signals from EPE’s SCC in accordance with the AGC Protocols.

  • By: Name: Title: EPE will receive and send AGC Set-Point and related data over an analog or digital line.


More Definitions of AGC Set-Point

AGC Set-Point means the Company-generated analog or digital signal sent by the SCADA System to the Facility, representing the maximum Renewable Energy output for the Facility. The AGC Set-Point is calculated by the EMCC AGC system and communicated electronically through the SCADA System as required by Section 3.3.
AGC Set-Point means the Company-generated analog or digital signal sent by the SCADA System to the Wind-Solar Hybrid Facility, representing the quantity of Renewable Energy to be generated by the Wind-Solar Hybrid Facility. The AGC Set- Point is calculated by the EMCC AGC system and communicated electronically to the Wind-Solar Hybrid Facility via the SCADA System.
AGC Set-Point means an analog or digital signal updated every four (4) seconds sent to the Storage Facility by PacifiCorp, the Interconnection Provider, the Transmission Provider or the Market Operator with respect to the Storage Facility operations using AGC.
AGC Set-Point means the Company-generated analog or digital signal sent by the SCADA System to the Facility, representing the maximum Renewable Energy output for the Facility. The AGC Set-Point is calculated by the EMCC AGC system and communicated electronically through the SCADA System as required by Section 3.3.
AGC Set-Point means the Company-generated analog or digital signal sent by the SCADA System to the Wind-Solar Hybrid Facility, representing the quantity of Renewable Energy to be generated by the Wind-Solar Hybrid Facility. The AGC Set- Point is calculated by the EMCC AGC system and communicated electronically to the Wind-Solar Hybrid Facility via the SCADA System.