Advertisement on Project Highway Sample Clauses

The 'Advertisement on Project Highway' clause governs the placement and management of advertisements along a specific highway project. It typically outlines who has the right to install, operate, and maintain advertising structures, as well as any revenue-sharing arrangements or restrictions on the type and size of advertisements allowed. This clause ensures that advertising activities are controlled and coordinated, preventing disputes over rights and maintaining the intended aesthetic or safety standards of the highway.
Advertisement on Project Highway. The Project Highway or any part thereof shall not be used in any manner to advertise any commercial product or services.
Advertisement on Project Highway. The Project Highway or any part thereof shall not be used in any manner to advertise any commercial product or services. The Contractor shall bear full risk in, and take full responsibility for, the care of the Works, and of the Materials, goods and equipment for incorporation therein, from the Appointed Date until the date of Completion Certificate, save and except to the extent that any such loss or damage shall have arisen from any wilful default or gross neglect of the Authority. The Contractor shall be responsible for procuring of all utilities as may be required, including without limitation, adequate power, water and other services. Except as otherwise stated in the Agreement:
Advertisement on Project Highway. The Project Highway or any part thereof shall not be used in any manner to advertise any commercial product or services. 4.6 Contractor's care of the Works The Contractor shall bear full risk in, and take full responsibility for, the care of the Works, and of the Materials, goods and equipment for incorporation therein, from the Appointed Date until the date of Completion Certificate, save and except to the extent that any such loss or damage shall have arisen from any wilful default or gross neglect of the Authority. 4.7 Electricity, water and other services The Contractor shall be responsible for procuring of all utilities as may be required, including without limitation, adequate power, water and other services. 4.8 Unforeseeable difficulties Except as otherwise stated in the Agreement: (a) the Contractor accepts complete responsibility for having foreseen all difficulties and costs of successfully completing the Works; (b) the Contract Price shall not be adjusted to take account of any unforeseen difficulties or costs; and (c) the Scheduled Completion Date shall not be adjusted to take account of any unforeseen difficulties or costs. 4.9 Co-ordination of the Works (i) The Contractor acknowledges that in addition to the Agreement, it is also aware of terms of the other Project contracts and other agreements the Authority has negotiated and entered into for performance of its obligations under the Agreement ( copies of other contracts and other agreements are made available to the Contractor from time to time) and that the Contractor is fully aware of the consequences to the Authority which would or are likely to result from a breach by the Contractor of its obligations under the Agreement. In the event the actions of the Contractor result in the breach by the Authority of any or all of the other Project contracts and such breach imposes any liability on the Authority, the Contractor shall: (a) undertake all steps as may be possible to mitigate or neutralize the liability that has arisen, and (b) indemnify the Authority against any such liability and compensate the Authority to that extent. (ii) The Contractor shall be responsible for the co-ordination and proper provision of the Works, including co-ordination of other Contractors or Sub-contractors for the Project. The Contractor shall co-operate with the Authority in the co- ordination of the Works with the works under the other Project contracts. The Contractor shall provide all reasonable support for...
Advertisement on Project Highway. (Km 20.900 to Km 47.075 on EPC Mode through ADB Loan assistance The Project Highway or any part thereof shall not be used in any manner to advertise any commercial product or services.
Advertisement on Project Highway km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I) June 2021
Advertisement on Project Highway. The Project Highway or any part thereof shall not be used in any manner to advertise any commercial product or services. 4.6 Contractor's care of the Works The Contractor shall bear full risk in, and take full responsibility for, the care of the Contract AgreementPage 37 of 145 Construction of 2 lane Minor Bridge at Km 26.700 (Dhanikhadi) in CRZ area on NH-4
Advertisement on Project Highway. DCA for Up-gradation to 4-lane with PS from Km 6.00 to Km 26.350 of 20.350 Km length on Jammu Akhnoor Section of NH-144A in State of J&K
Advertisement on Project Highway. Maheshkola (Design Ch. 55.525km )[R-M-B Package-II] on SH-4 section of Ranikor- Maheshkhola- Baghmara Project in the state of Meghalaya on EPC basis July 2021