Examples of Additional Stage in a sentence
LCD Projectors2 Screens (7.4’ by 11.8’)12 Channel Mixer2 Wireless Handheld or Lavalier Microphones Wireless Slide Advancer1 Podium with Microphone House SoundPipe & Drape (Black or Grey)Additional Panelist Microphones @150 each Additional Stage Lighting Package @1000STANDARD BREAKOUT $10001 LCD Projector1 Screen (10’ by 10’)Laptop Power, Connection Cables/AdaptersTechnician recommended for any meeting room using more than 3 microphones.
Additional Stage 3 (Construction) and Stage 4 (Monitoring) audits might be required.
A.5 Additional Stage Scoring.Stage PointsInterview (if used) 20Written questions (if used) 10ATTACHMENT B – BACKGROUND INFORMATION A.1 Lane County Deferred Compensation Plan Overview The Lane County Deferred Compensation Plan was established in accordance with Internal Revenue Code Section 457.
If a further stage or stages are required, the points allocated at each stage (shown in Additional Stage Scoring below) will be added to the proposal score.
Additional Stage Managers shall receive no less than the Second Assistant Director minimum salary set forth in Article 5-201 of the NCA for each day of employment.
This now finalises 23.140 REL-5- MM7 Stage 3 finalisation resulted in some corrections to Stage 2- Address visibility- MM1/MM7 and MM4/MM7 header mapping- CDR list updated- Additional Stage 1 requirements provided by SA#15 for charged party indication incorporated into Stage 2- Message Size defined as requested by GSMA BARG- Message Distribution Indicator added- Inclusion of MIME type for SMS encapsulation and alignment with MMS codec specification 26.140- MMS REL-6 WID: Initial draft produced.
Additional Stage I and Stage II studies are planned for additional areas as a result of a gap analysis performed to identify missing datasets for the proposed transmission corridor.
Prior to the change, KPC's financial year commenced on 1 July and ended on the next following 30 June.
The development must be constructed to achieve the project specific construction NMLs detailed in Section 7 of the Noise and Vibration Impact Assessment Report prepared by Acoustic Studio dated 17 October 2018 and addendum report Additional Stage 1 Works – Site Access and Associated Road Works prepared by Acoustic Studio dated 18 January 2019 for all the identified residential and non-residential receivers.
Additional Stage 2 Tender Costs£12,329.64The Stage 1 Tender Document required Makers to include all resources and costs associated with undertaking all requirements identified within the 2 Stage Tender Procedure and to provide full details of his pre-construction resources as required by Clause 1 of the two stage tender procedures.The contractor to include for Stage 2 services for the period between acceptance of Stage 1 tender and 20 January 2006.