ACPI definition
Examples of ACPI in a sentence
The interaction between the cloud orchestrator and the DCN Control Plane is based on the REST API exposed at the A-CPI of the SDN controller and, optionally, can make use of REST APIs developed by SDN applications running on top of the controller itself.
The core network functions presented above provides all the tools and the primitives, i.e. through the A-CPI, to manage, control and operate the COSIGN optical DCN in a programmable and flexible way.
For systems where ACPI standards are applicable, the Off Mode correlates to ACPI System Level S5 state.
The REST APIs offered by this application at the SDN controller’s A-CPI are used for the interaction with the Neutron component of the cloud platform for the on-demand provisioning of overlay virtual networks.
The A-CPI provides capabilities for interrogation of the network topology, setting up OF rules in devices, setting up virtual networks (through Virtual Network Filter) and defining firewall rules.
A-CPI language For the A-CPI, OpenDaylight supports the OSGi framework where Java is the developing language, bidirectional REST employing JSON and DOM API employing XML.
In particular, it does not need to have a direct view of the DCN topology and capabilities, but it can just rely on the abstract connection services provided by the infrastructure control layer, i.e. by the SDN controller A-CPI APIs. This approach simplifies the service virtualization approach, since it operates just at the network edges.
The northbound interface (Application plane to Controller Plane Interface – A-CPI) allows the communication between the control and application layers.
A-CPI language REST REST: HTTP + JSON REST REST REST Cloud management systems integration Openstack Neutron ML2 Openstack (Quantum) OpenCloud (maintained by ON.LAB) Openstack Openstack (Quantum) Available virtualization applications OpenDove Virtual Tenant Network Integration with OpenStack through Neutron API Virtual Network Filter- provides the integration with Openstack (MAC -based isolation logic).
Prior to the close of the Entry Period, GGYC shall provide the Confirmation of Defense in the form set out at Schedule 2, duly completed and signed, together with written confirmation of payment of the first installment of the Entry Fee (per Article 16.3(a)), the ACPI contribution (per Article 16.3(b)) and the Competitor website contribution (per Article 16.3(c)).