The Library’s A/E Design Team will participate in these coordination meetings with the ▇▇▇▇ and subcontractors to identify and resolve installation conflicts during the design and construction phases.
The ▇▇▇▇ shall obtain all permits required for construction with the assistance of the Library’s A/E Design Team.
These reports shall be detailed in coordination efforts with the Library’s A/E Design Team, and the Library Project Team during the design phase of the project.
Cost estimates will be reviewed and validated by the Owner Project Team and the Library’s A/E Design Team during the plans review phase.
The ▇▇▇▇ shall assist the Owner Project Team and Library’s A/E Design Team with the design and applying “Green Design Principles” to the overall project design.
The Library’s A/E Design Team will revise original design drawings of the project using contractor supplied as-builts and submit to the Library within thirty (30) working days of the final completion date, a CD, USB drive or other Library acceptable electronic format with the drawings in AutoCAD and PDF, certification as to the accuracy of the record drawings and specifications in MS-Word and PDF (latest editions).Current as-built documents from the ▇▇▇▇ shall be a requirement for pay application approval.
The Library Project Team will manage and monitor at all times the Submittal log in conjunction with the Library’s A/E Design Team.
The Library’s A/E Design Team will review all submittals on e-Builder ( or similar ) concerning product data, shop drawings and other submissions, as required for general conformance with design concept of this Project and the Contract Documents in consultation with the Library.
The Library’s A/E Design Team, along with its Sub-consultants, shall provide the Owner with a written report listing all items covered by warranty or guarantee coverage that are observed or otherwise found to be defective, inoperable, or not performing their intended function in a satisfactory manner The report shall include recommendations for resolving all the items so noted in the warranty inspection report.
The Library’s A/E Design Team will determine any capacity limitations for development, including electric, gas, potable water, reclaimed water, and chilled water.