Common Contracts

1 similar 2018 Summer Storage Agreement contracts

Contract
2018 Summer Storage Agreement • December 1st, 2017

[ ] Gold Launch Pass – Includes Valet Service 7 days/wk and/or River Slip: $1,895.00 [ ] PWC floating ramp in water – located in basin $ 895.00 [ ] PWC water slip– located in basin $ 500.00 [ ] E, F, & G Dock – Up River – Boats up to 24’ LOA – Max. 8’ Beam: $2,195.00 [ ] E,F, & G Dock – Down River – Boats up to 24’ LOA – Max 9’ Beam: $2,495.00 [ ] E, F, & G Dock – River Slip – Boats more than 25’ LOA – Over 9’ Beam: $2,795.00 [ ] E, F, & G Dock – Single/Bulkhead / End T-Slips – single slip $2,995.00 [ ] C & D Dock - Basin Slips – Boats up to 23’ LOA Max. 8’ Beam: $1,895.00 [ ] B Dock – Basin Slips – Back Side - Boats up to 28’ LOA – 10’ Beam: $2,495.00 [ ] B Dock – Basin Slips – Front Side - Boats up to 32’ LOA – 12’ Beam: $2,695.00 [ ] A Dock – Basin Slips _ Back Side – Boats up to 34’ LOA – 13’ Beam: $2,895.00 [ ] A Dock – Basin Slips – Front Side – Boats up to 40’ LOA – 14’ Beam: $2,995.00 [ ] H Dock – Individual Bulk Head River Slips – boats up to 54’ $75/foot

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.