Common Contracts

1 similar Master Agreement contracts

Contract
Master Agreement • April 13th, 2018 • Idaho

The existing pavement in the eight hundred foot long segment of Almon Street between Third Street and ‘A’ Street is severely deteriorated. With an Overall Condition Index of 19.37 (Very Poor) out of 100, this segment is in need of a full reconstruction. At one time, this street was paved with Portland cement concrete pavement. Through many years of roadway maintenance and utility repairs it has been overlain with hot mix asphalt pavement, and the underlying concrete pavement has been removed and patched back with asphalt pavement in various locations. This has created a random patchwork of asphalt and concrete pavement sections throughout the roadway segment.

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.