Ρρότυπα διαςφάλιςθσ ποιότθτασ Sample Clauses

Ρρότυπα διαςφάλιςθσ ποιότθτασ. Οι οικονομικοί φορείσ για τθν παροφςα διαδικαςία ςφναψθσ ςφμβαςθσ οφείλουν να ςυμμορφϊνονται με το πρότυπο ISO 9001 ι από άλλα ιςοδφναμαςυςτιματα διαςφάλιςθσ ποιότθτασ τα οποία βαςίηονται ςτθ ςχετικι ςειρά ευρωπαϊκϊν προτφπων και ζχουν πιςτοποιθκεί από διαπιςτευμζνουσ οργανιςμοφσ. (άρκρο 82 παρ. 1 ν. 4412/2016).
AutoNDA by SimpleDocs

Related to Ρρότυπα διαςφάλιςθσ ποιότθτασ

  • SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" GLAZING TO STEEL WITH PUTTY 4mm Obscure safety glass: 1 Panes not exceeding 0,1 m2 m2 3 Carried Forward to Summary of Section No. 3 R Section No. 3 SMD1 Bill No. 11 GLAZING BVI CONSULTING ENGINEERS Amount Item No SECTION 3 Quantity Rate Amount BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 6 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 3 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 3 Section No. 3 SMD1 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SMD1 Bill No Page No 1 EARTHWORKS 61 2 CONCRETE,FORMWORK AND REINFORCEMENT 63 3 MASONRY 66 4 WATERPROOFING 67 5 ROOF COVERINGS 69 6 CARPENTRY AND JOINERY 71 7 IRONMONGERY 73 8 METALWORK 74 9 PLASTERING 75 10 PLUMBING AND DRAINAGE 78 11 GLAZING 79 12 PAINTWORK 80 Carried to Final Summary Section No. 3 SMD1 BVI CONSULTING ENGINEERS Amount R Item No SECTION 4 Quantity Rate Amount BILL NO.1 EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs,xxxx and trees not exceeding 200mm girth, etc. m2 73 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 73 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 18 4 Pit m3 27 5 For aprons thickenning m3 4 Extra over trench and hole excavations in earth for excavation: 6 Soft rock m3 49 7 Hard rock m3 49 Extra over all excavations for carting away: 8 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 35 Carried Forward Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Brought Forward R Risk of collapse of excavations: 9 Sides of trench and hole excavation not exceeding 1,5m deep. m2 82 Keeping excavations free of water: 10 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 11 Under floors, steps, pavings, etc. m3 7 12 Backfilling to trenches, holes, etc. m3 9 Compaction of surfaces: 13 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 25 14 Compaction of ground surface to pits etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 20 15 Compaction of ground surface to aprons etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 44 Prescribed density tests on filling: 16 Modified AASHTO Density tests No 5 SOIL POISONING Carried Forward R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS Brought Forward R Soil insecticide: 17 Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming. m2 25 18 To bottom of concrate aprons m2 44 19 To bottoms and sides of trenches, etc. m2 69 Carried Forward to Summary of Section No. 4 R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Amount

  • Terms, definitions Capitalized terms used in this Agreement shall have the same definitions as contained in the Redevelopment Agreement, unless specifically defined otherwise.

  • General Definitions 1. For the purposes of this Agreement, unless the context otherwise requires:

  • Master Definitions Supplement All terms and expressions used in this Agreement shall have the same meaning as those contained in the Master Definitions Supplement to the CAISO Tariff.

  • 020 Definitions The following definitions shall be applicable to this chapter:

  • Definitions Rules of Interpretation Capitalized terms used but not defined herein shall have the meanings set forth in Schedule 1.1, and the rules of interpretation set forth in Schedule 1.1 shall apply to this Facility Lease.

  • Definitions and Rules of Interpretation In this Contract, the following terms, whether capitalized or not, shall have the meanings set forth below, unless it is clear in the Contract that the context requires otherwise. In addition, the rules of interpretation set forth below shall apply.

  • DEFINITIONS AND INTERPRETATION Definitions 1.1 In this Contract, unless the contrary intention appears: Activity End Date means the date reported as such in a Student Statistical Report for an individual's enrolment in an individual subject. Activity Start Date means the date reported as such in a Student Statistical Report for an individual's enrolment in an individual subject. Apprentice has the meaning given to it in the Act. Approved Training Scheme means a training scheme approved under section 5.5.2 of the Act. Brokering Services means the recruitment of individuals to participate in Skills First subsidised training in exchange for payment from the Training Provider or the student. It excludes activities carried out by individuals who are employees of the Training Provider on the Training Provider’s payroll, whose role includes the identification and recruitment of potential students. Business Day means a day which is not a Saturday, Sunday or a public holiday in Melbourne, Victoria.

  • A1 Definitions and Interpretation A1.1 In this Contract unless the context otherwise requires the following provisions shall have the meanings given to them below:

  • AND DEFINITIONS For the purpose of this Agreement:

Time is Money Join Law Insider Premium to draft better contracts faster.