WORK JURISDICTION. The scope of work covered by this Agreement includes the following, but is not limited to: A. All washing down, cleaning, caulking, pointing and weatherproofing of brick, stone or marble work shall be performed by Pointer, Cleaner, Caulkers; including caulking and cleaning of all types of masonry (including precast masonry and concrete panels) and caulking of all window frames encased in brick, stone, concrete or other masonry. B. All grinding and cutting out of brick, stone, marble, or other masonry joints and replacing of joints only. Replacing, pointing, patching, dutchman patching of brick, stone, terracotta, and all masonry materials. C. Installation of all types of sealants including but not limited to: epoxies, silicones, and urethanes. Application of all clear weatherproofing and waterproofing materials used in pointing, cleaning, caulking, weatherproofing, waterproofing and expansion joints on all types of construction and shall cover the following but not limited to: Concrete, Brick, Concrete Block, Marble, Stone, Tile, Precast Concrete, Glass Fiber Reinforced Concrete, Exterior Insulated Finish System, Plaster, Metal Windows, Storefronts, Curtain Wall, Glass Blocks, Hollow Metal, Fire Caulking, rainscreen walls and Caulking of Cementicous Panels. D. This Agreement shall cover all epoxy injection, epoxy grouting, epoxy coatings, and epoxy sealants. All above grade weatherproofing and waterproofing, deck coatings and below grade damproofing. E. The assembly and hanging of all types of hanging platforms, baskets, boatswains chairs etc., including: setting up guard rails, electric motors, wire rope cable, rope falls, electric cables and other miscellaneous swing staging equipment. Installation of C-hooks, out riggers, beams, counter weights, parapet clamps and the like. All rigging and safety tie backs, installation of lifelines and other fall arrest procedures and equipment. All moving and relocation of power suspended platform equipment. The operation of man-lifts, hydraulic scaffolding and aerial lifts. This agreement shall cover all products or new systems relating to the aforementioned hanging or aerial equipment. F. The chemical cleaning, water blasting, steam cleaning, other types of power washing and hand cleaning. Dry cleaning, sand blasting, power cleaning with limestone dust and crushed glass, etc. Installation and operation of all systems that collect any material after use. Paint stripping, chemical or mechanical. Mixing mortars, striping, drilling, pinning, and anchoring masonry material. Selective captured demolition for replacement with same or like material, and rebuilding of masonry., Torch cutting and welding, shelf angle and lintel replacement, flashing and epoxy anchoring as related to masonry repairs. Brick, stone, and concrete restoration and patching - including all preparatory work, chipping, sawing, clean-up and coating. Masonry and concrete chimney and smoke stack repair, terra cotta repairs and replacement, toothing of brick and stone, application of clear repellent waterproofing, application of cement base or acrylic coatings on masonry materials. Mold making and fabrication of specialty masonry and stone items. Installation of fiberglass, plastic gypsum, reinforced concrete, pre-cast, GFRC, and vinyl substitutes etc. when being replaced or substituted for masonry materials. G. Application of carbon fiber, epoxy fabric wrap and banding systems for the restoration and retrofit on concrete or masonry. H. In addition, this Agreement shall cover all other assignments mutually agreed upon by the Parties to this Agreement on any other building products or systems related to the scope and type of work covered by this Agreement that are determined by the Parties to fall within the work jurisdiction of this Agreement I. The Union and signatory Contractors recognize that a portion of the work described, (excluding B), in this Agreement is claimed by other Unions. Where necessary to avoid jurisdictional disputes, the Employer and the Union shall mutually agree upon establishing a composite crew for the work in question.
Appears in 2 contracts
Sources: Collective Bargaining Agreement, Collective Bargaining Agreement
WORK JURISDICTION. The scope of work covered by this Agreement includes the following, but is not limited to:
A. All washing down, cleaning, caulking, pointing and weatherproofing of brick, stone or marble work shall be performed by Pointer, Cleaner, Caulkers; including caulking and cleaning of all types of masonry (including precast masonry and concrete panels) and caulking of all window frames encased in brick, stone, concrete or other masonry.
B. All grinding and cutting out of brick, stone, marble, or other masonry joints and replacing of joints only. Replacing, pointing, patching, dutchman patching of brick, stone, terracotta, and all masonry materials.
C. Installation of all types of sealants including but not limited to: epoxies, silicones, and urethanes. Application of all clear weatherproofing and waterproofing materials used in pointing, cleaning, caulking, weatherproofing, waterproofing and expansion joints on all types of construction and shall cover the following but not limited to: Concrete, Brick, Concrete Block, Marble, Stone, Tile, Precast Concrete, Glass Fiber Reinforced Concrete, Exterior Insulated Finish System, Plaster, Metal Windows, Storefronts, Curtain Wall, Glass Blocks, Hollow Metal, Fire Caulking, rainscreen walls and Caulking of Cementicous Panels.
D. This Agreement shall cover all epoxy injection, epoxy grouting, epoxy coatings, and epoxy sealants. All above grade weatherproofing and waterproofing, deck coatings and below grade damproofing.
E. The assembly and hanging of all types of hanging platforms, baskets, boatswains chairs etc., including: setting up guard rails, electric motors, wire rope cable, rope falls, electric cables and other miscellaneous swing staging equipment. Installation of C-hooks, out riggers, beams, counter weights, parapet clamps and the like. All rigging and safety tie backs, installation of lifelines and other fall arrest procedures and equipment. All moving and relocation of power suspended platform equipment. The operation of man-lifts, hydraulic scaffolding and aerial lifts. This agreement shall cover all products or new systems relating to the aforementioned hanging or aerial equipment.
F. The chemical cleaning, water blasting, steam cleaning, other types of power washing and hand cleaning. Dry cleaning, sand blasting, power cleaning with limestone dust and crushed glass, etc. Installation and operation of all systems that collect any material after use. Paint stripping, chemical or mechanical. Mixing mortars, striping, drilling, pinning, and anchoring masonry material. Selective captured demolition for replacement with same or like material, and rebuilding of masonry., Torch cutting and welding, shelf angle and lintel replacement, flashing and epoxy anchoring as related to masonry repairs. Brick, stone, and concrete restoration and patching - including all preparatory work, chipping, sawing, clean-up and coating. Masonry and concrete chimney and smoke stack repair, terra cotta repairs and replacement, toothing of brick and stone, application of clear repellent waterproofing, application of cement base or acrylic coatings on masonry materials. Mold making and fabrication of specialty masonry and stone items. Installation of fiberglass, plastic gypsum, reinforced concrete, pre-cast, GFRC, and vinyl substitutes etc. when being replaced or substituted for masonry materials.
G. Application of carbon fiber, epoxy fabric wrap and banding systems for the restoration and retrofit on concrete or masonry.
H. In addition, this Agreement shall cover all other assignments mutually agreed upon by the Parties to this Agreement on any other building products or systems related to the scope and type of work covered by this Agreement that are determined by the Parties to fall within the work jurisdiction of this Agreement.
I. The Union and signatory Contractors recognize that a portion of the work described, (excluding B), in this Agreement is claimed by other Unions. Where necessary to avoid jurisdictional disputes, the Employer and the Union shall mutually agree upon establishing a composite crew for the work in question.
Appears in 2 contracts
Sources: Collective Bargaining Agreement, Collective Bargaining Agreement
WORK JURISDICTION. (Special Provision)
(a) The scope employer recognizes the trade jurisdiction of the Council and agrees to assign work of such jurisdiction to the employees covered by this Appendix. For purposes of the Acoustic and Drywall trade, the trade jurisdiction of the Council shall consist of, but shall not be limited to the following: The installation of all materials and component parts of all types of ceilings regardless of their material composition or method or manner of their installation, attachment or connection, including but not limited to all hangers, carrying channels, cross furring stiffeners, braces, all bars regardless of material or method of attachment, all integrated gypsum board, all integrated ceilings, ceiling heat panels, all radiant ceiling heat fill, all main tees, cross tees, splines, splays, wall and ceiling angles or mouldings, all backing board and all finish ceiling materials regardless of method of installation; all work in connection with the installation, erection and/or application of all materials and component parts of walls and partitions regardless of their material composition or method or manner of their installation, attachment or connection, including but not limited to all floor and ceiling runners, metal studs, stiffeners, cross bracing's, fire- blocking, resilient channels and furring channels; the installation of metal door and window frames, metal casing, metal trim and metal plaster stops, moulding, base and accessory trim items for partition systems; the installation of gypsum drywall materials, laminated gypsum systems, backing board and finish board; the fireproofing of beams, columns and chase; the installation of sound and thermal insulation materials; the installation of fixture attachments including all layout work and the preparation of all openings for lighting, air vents or other purposes, and all other necessary or related work in connection therewith; the installation, tying, and connection of all types of metal furring erected to receive the materials specified in this Article including but not limited to gypsum wall board, gypsum lath and metal lath and metal corner beads, ceiling heat panels, backing boards, installation of any material used as a base for thin coat plaster, acoustical material of mineral or fibre; the installation of lead baffles insulation material, bead board and rigid insulation, metal and/or plastic compositions, including monolithic adhesives or any material attached to the above described metal construction. Demolition work and dismantling of all re-usable material pertaining to the acoustic and drywall work jurisdiction shall be performed by employees covered by this Appendix.
(b) The installation of all pre-built, either on-site, or off-site, light weight exterior component systems, such as but not limited to, EIFS Systems including all the metal framing, gypsum board, the insulation and all attachment including all welding related to this work.
(c) No limitation shall be placed on the work covered by this Agreement trade jurisdiction by reason of the surface of texture or purpose for which the material described herein is used, designed or intended.
(d) The trade jurisdiction includes the followinghandling, but is not limited to:
A. All washing downand clean up, cleaning, caulking, pointing and weatherproofing of brick, stone or marble work shall be performed by Pointer, Cleaner, Caulkers; including caulking and cleaning of all types the materials listed in the Sections of masonry (including precast masonry and concrete panels) and caulking of all window frames encased in brick, stone, concrete or other masonry.
B. All grinding and cutting out of brick, stone, marble, or other masonry joints and replacing of joints only. Replacing, pointing, patching, dutchman patching of brick, stone, terracotta, this Article and all masonry materials.
C. Installation of all types of sealants including but not limited to: epoxies, silicones, and urethanes. Application of all clear weatherproofing and waterproofing materials used in pointing, cleaning, caulking, weatherproofing, waterproofing and expansion joints on all types of construction and shall cover and/or equipment required to carry out the following but not limited to: Concrete, Brick, Concrete Block, Marble, Stone, Tile, Precast Concrete, Glass Fiber Reinforced Concrete, Exterior Insulated Finish System, Plaster, Metal Windows, Storefronts, Curtain Wall, Glass Blocks, Hollow Metal, Fire Caulking, rainscreen walls and Caulking of Cementicous Panels.
D. This Agreement shall cover all epoxy injection, epoxy grouting, epoxy coatings, and epoxy sealants. All above grade weatherproofing and waterproofing, deck coatings and below grade damproofing.
E. The assembly and hanging of all types of hanging platforms, baskets, boatswains chairs etc., including: setting up guard rails, electric motors, wire rope cable, rope falls, electric cables and other miscellaneous swing staging equipment. Installation of C-hooks, out riggers, beams, counter weights, parapet clamps and the like. All rigging and safety tie backs, installation of lifelines and other fall arrest procedures and equipment. All moving and relocation of power suspended platform equipment. The operation of man-lifts, hydraulic scaffolding and aerial lifts. This agreement shall cover all products or new systems relating to the aforementioned hanging or aerial equipment.
F. The chemical cleaning, water blasting, steam cleaning, other types of power washing and hand cleaning. Dry cleaning, sand blasting, power cleaning with limestone dust and crushed glass, etc. Installation and operation of all systems that collect any material after use. Paint stripping, chemical or mechanical. Mixing mortars, striping, drilling, pinning, and anchoring masonry material. Selective captured demolition for replacement with same or like material, and rebuilding of masonry., Torch cutting and welding, shelf angle and lintel replacement, flashing and epoxy anchoring as related to masonry repairs. Brick, stone, and concrete restoration and patching - including all preparatory work, chipping, sawing, clean-up and coating. Masonry and concrete chimney and smoke stack repair, terra cotta repairs and replacement, toothing of brick and stone, application of clear repellent waterproofing, application of cement base or acrylic coatings on masonry materials. Mold making and fabrication of specialty masonry and stone items. Installation of fiberglass, plastic gypsum, reinforced concrete, pre-cast, GFRC, and vinyl substitutes etc. when being replaced or substituted for masonry materials.
G. Application of carbon fiber, epoxy fabric wrap and banding systems for the restoration and retrofit on concrete or masonry.
H. In addition, this Agreement shall cover all other assignments mutually agreed upon by the Parties to this Agreement on any other building products or systems related to the scope and type of work covered by this Agreement that are determined by the Parties to fall within trade jurisdiction.
(e) In geographic areas where members of ▇▇▇ ▇▇▇▇▇▇▇▇▇▇ Union have traditionally performed taping, the work jurisdiction fireproofing of this Agreement
I. The Union beams, columns and signatory Contractors recognize that a portion of the work described, (excluding B), in this Agreement is claimed by other Unions. Where necessary to avoid jurisdictional disputeschase including fire caulking, the Employer shall recognize such jurisdiction and the Union shall mutually agree upon establishing a composite crew for the assign such work in questionto employees covered by this Appendix.
Appears in 2 contracts
Sources: Acoustic and Drywall Appendix, Acoustic and Drywall Appendix
WORK JURISDICTION. The scope of work covered by this Agreement includes the following, but is not limited to:
A. All washing down, cleaning, caulking, pointing and weatherproofing of brick, stone or marble work shall be performed by Pointerbricklayers, Cleaner, Caulkers; stone masons and tuckpointers including caulking and cleaning of all types of masonry (including precast masonry and concrete panels) and caulking of all window frames encased in brick, stone, concrete or other masonry.
B. All grinding and cutting out of brick, stone, marble, or other masonry joints and replacing of joints only. Replacing, pointing, patching, dutchman patching of brick, stone, terracotta, All sand blasting and all masonry materialssteam cleaning is included.
C. Installation of all All types of sealants including but not limited to: mastics, plastics, epoxies, siliconesthiokols, silicone, urethanes and urethanes. Application of all clear weatherproofing and waterproofing materials used in pointing, cleaning, caulking, weatherproofing, weatherproofing and waterproofing and expansion joints on of all types of construction and shall cover the following but not limited to: Concrete, Brick, Concrete Block, Marble, Stone, Tile, Precast Concrete, Glass Fiber Reinforced Concrete, Exterior Insulated Finish System, Plaster, Wood, Metal Windows, Storefronts, Curtain Wall, Glass Blocks, Hollow Metal, Fire Caulking, rainscreen walls and Caulking of Cementicous Panels.
D. This Agreement shall cover all epoxy injection, epoxy grouting, epoxy coatings, and epoxy sealants. All cement washing and restoration of concrete shall be performed by tuckpointers. All above grade weatherproofing and waterproofing, deck coatings and below grade damproofing.
E. The assembly and hanging of all types of hanging platforms, baskets, boatswains chairs etc., including: setting up guard rails, electric motors, wire rope cable, rope falls, electric cables and other miscellaneous swing staging equipment. Installation of C-hooks, out riggers, beams, counter weights, parapet clamps and the like. All rigging and safety tie backsback., installation Installation of lifelines and other fall arrest procedures and equipment. All all moving and relocation of power suspended platform equipment. The operation Operation of man-lifts, lifts and other hydraulic scaffolding and aerial lifts. This agreement shall cover all products or new systems relating to the aforementioned hanging or aerial equipment.
F. The Building inspections and survey, chemical cleaning, water blasting, steam cleaning, other types of power washing and hand cleaning. Dry cleaning, sand blasting, power cleaning with limestone dust and crushed glass, etc. Installation and operation of all systems that collect any material after use. Paint stripping, chemical or mechanical. Mixing Cutting out joints by power or by hand method, mixing mortars, pointing repointing, scrub, Manchester grouting, striping, drilling, pinning, and anchoring masonry material. Selective captured demolition for replacement with same or like material, and rebuilding of masonry., Torch cutting of steel and welding operations. Brick and stone replacement-Dutchman, torch cutting and welding, shelf angle and lintel replacement, flashing and epoxy anchoring welding as related to masonry repairs, shelf angle and Lintel replacement, flashing and anchoring epoxy anchoring. Brick, stone, Brick and concrete restoration and stone patching - including all preparatory work, chipping, sawing, clean-up and coating. Masonry and concrete chimney and smoke stack repair, terra cotta repairs and replacement, toothing of brick and stone, application of clear repellent waterproofing, application of cement base or acrylic coatings on masonry materialscoating. Mold making and fabrication of specialty masonry and stone items. Installation of fiberglass, plastic gypsum, reinforced concrete, pre-cast, GFRC, concrete and vinyl substitutes etc. when being replaced substitutes, operating chipping guns or substituted for masonry materialshammers, electric power tools and other equipment necessary.
G. Application of carbon fiber, epoxy fabric wrap and banding systems for the restoration and retrofit on concrete or masonry.
H. In addition, this Agreement shall cover all other assignments mutually agreed upon by the Parties to this Agreement on any other building products or systems related to the scope and type of work covered by this Agreement that are determined by the Parties to fall within the work jurisdiction of this Agreement
I. The Union and signatory Contractors recognize that a portion of the work described, (excluding B), described in this Agreement is claimed by other Unions. Where necessary to avoid jurisdictional disputes, the Employer and the Union shall mutually agree upon establishing a composite crew for the work in question.
Appears in 1 contract
Sources: Collective Bargaining Agreement
WORK JURISDICTION. The scope of work covered by this Agreement includes the following, but is not limited to:
A. All washing down, cleaning, caulking, pointing and weatherproofing of brick, stone or marble work shall be performed by Pointerbricklayers, Cleaner, Caulkers; stone masons and tuckpointers including caulking and cleaning of all types of masonry (including precast masonry and concrete panels) and caulking of all window frames encased in brick, stone, concrete or other masonry.
B. All grinding and cutting out of brick, stone, marble, or other masonry joints and replacing of joints only. Replacing, pointing, patching, dutchman patching of brick, stone, terracotta, All sand blasting and all masonry materialssteam cleaning is included.
C. Installation of all All types of sealants including but not limited to: mastics, plastics, epoxies, siliconesthiokols, silicone, urethanes and urethanes. Application of all clear weatherproofing and waterproofing materials used in pointing, cleaning, caulking, weatherproofing, weatherproofing and waterproofing and expansion joints on of all types of construction and shall cover the following but not limited to: Concrete, Brick, Concrete Block, Marble, Stone, Tile, Precast Concrete, Glass Fiber Reinforced Concrete, Exterior Insulated Finish System, Plaster, Wood, Metal Windows, Storefronts, Curtain Wall, Glass Blocks, Hollow Metal, Fire Caulking, rainscreen walls and Caulking of Cementicous Panels.
D. This Agreement shall cover all epoxy injection, epoxy grouting, epoxy coatings, and epoxy sealants. All cement washing and restoration of concrete shall be performed by tuckpointers. All above grade weatherproofing and waterproofing, deck coatings and below grade damproofing.
E. The assembly and hanging of all types of hanging platforms, baskets, boatswains chairs etc., including: setting up guard rails, electric motors, wire rope cable, rope falls, electric cables and other miscellaneous swing staging equipment. Installation of C-hooks, out riggers, beams, counter weights, parapet clamps and the like. All rigging and safety tie backsback., installation Installation of lifelines and other fall arrest procedures and equipment. All all moving and relocation of power suspended platform equipment. The operation Operation of man-lifts, lifts and other hydraulic scaffolding and aerial lifts. This agreement shall cover all products or new systems relating to the aforementioned hanging or aerial equipment.
F. The Building inspections and survey, chemical cleaning, water blasting, steam cleaning, other types of power washing and hand cleaning. Dry cleaning, sand blasting, power cleaning with limestone dust and crushed glass, etc. Installation and operation of all systems that collect any material after use. Paint stripping, chemical or mechanical. Mixing Cutting out joints by power or by hand method, mixing mortars, pointing repointing, scrub, Manchester grouting, striping, drilling, pinning, and anchoring masonry material. Selective captured demolition for replacement with same or like material, and rebuilding of masonry., Torch cutting of steel and welding operations. Brick and stone replacement-Dutchman, torch cutting and welding, shelf angle and lintel replacement, flashing and epoxy anchoring welding as related to masonry repairs, shelf angle and Lintel replacement, flashing and anchoring epoxy anchoring. Brick, stone, Brick and concrete restoration and stone patching - including all preparatory work, chipping, sawing, clean-up and coating. Masonry and concrete chimney and smoke stack repair, terra cotta repairs and replacement, toothing of brick and stone, application of clear repellent waterproofing, application of cement base or acrylic coatings on masonry materialscoating. Mold making and fabrication of specialty masonry and stone items. Installation of fiberglass, plastic gypsum, reinforced concrete, pre-cast, GFRC, concrete and vinyl substitutes etc. when being replaced substitutes, operating chipping guns or substituted for masonry materialshammers, electric power tools and other equipment necessary.
G. Application of carbon fiber, epoxy fabric wrap and banding systems for the restoration and retrofit on concrete or masonry.
H. In addition, this Agreement shall cover all other assignments mutually agreed upon by the Parties to this Agreement on any other building products or systems related to the scope and type of work covered by this Agreement that are determined by the Parties to fall within the work jurisdiction of this Agreement
I. The Union and signatory Contractors recognize that a portion of the work described, (excluding B), described in this Agreement is claimed by other Unions. Where necessary to avoid jurisdictional disputes, the Employer and the Union shall mutually agree upon establishing a composite crew for the work in question.
Appears in 1 contract
Sources: Collective Bargaining Agreement