Withholding for unpaid wages and liquidated damages. The Authorized User shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal Agreement with the same prime contractor, or any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.
Appears in 9 contracts
Withholding for unpaid wages and liquidated damages. The Authorized User Owner shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractorContractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractorContractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor Contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section.
Appears in 4 contracts
Samples: Service Agreement, Service Agreement, Federal Contracting Requirements
Withholding for unpaid wages and liquidated damages. The Authorized User HUD or its designee shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract contract, or any other Federal Agreement contract with the same prime contractorcontract, or any other federally Federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, Act which is held by the same prime contractor, contractor such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph subparagraph (b)(2) of 2)of this sectionparagraph.
Appears in 4 contracts
Samples: www.cdbgsc.com, www.bidnet.com, www.bidnet.com
Withholding for unpaid wages and liquidated damages. The Authorized User grantee or recipient shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2b) of this section.
Appears in 3 contracts
Samples: Cooperative Purchasing Agreement, Cooperative Purchasing Agreement, Cooperative Purchasing Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User PROVIDER shall upon its own action or upon written request of an authorized representative of representativeof the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same thesame prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy tosatisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of 2)of this section.
Appears in 3 contracts
Samples: www.bidnet.com, www.tarrantcountytx.gov, www.tarrantcountytx.gov
Withholding for unpaid wages and liquidated damages. The Authorized User NTFB shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section...
Appears in 2 contracts
Samples: Services and Funding Agreement, Services and Funding Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User Authority shall upon its own action or upon written request of an authorized representative Authorized Representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor Subcontractor under any such contract or any other Federal Agreement contract with the same prime contractorContractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractorContractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor Contractor or subcontractor Subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section.
Appears in 2 contracts
Samples: Contract Agreement, Contract Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User AUTHORITY shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor Provider or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such ofsuch contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.
Appears in 1 contract
Samples: Professional Services Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User AUTHORITY shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work ofwork performed by the Contractor Provider or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.
Appears in 1 contract
Samples: Professional Services Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User State shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) C.2 of this section.
Appears in 1 contract
Samples: files.covid19.ca.gov
Withholding for unpaid wages and liquidated damages. The Authorized User shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal Agreement with the same prime contractor, . or any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary ne-cessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.
Appears in 1 contract
Samples: online.ogs.ny.gov
Withholding for unpaid wages and liquidated damages. The Authorized User SETFB shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section...
Appears in 1 contract
Samples: Services and Funding Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User AUTHORITY shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor Provider or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.
Appears in 1 contract
Samples: Professional Services Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User shall upon its own action or upon written request of an ofan authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or contractor any other Federal Agreement with the same prime contractor, or any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.
Appears in 1 contract
Samples: Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User Authority shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor Subcontractor under any such contract Contract or any other Federal Agreement federal contract with the same prime contractor, or any other federally federally- assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor Contractor or subcontractor Subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this sectionSection 46.16.2.
Appears in 1 contract
Samples: www.hsr.ca.gov
Withholding for unpaid wages and liquidated damages. The Authorized User contractor shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.
Appears in 1 contract
Samples: Federal Terms and Conditions
Withholding for unpaid wages and liquidated damages. The Authorized User Owner shall upon its own action or upon written request requires of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor Consultant or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section.
Appears in 1 contract
Samples: Agreement for Consulting Services
Withholding for unpaid wages and liquidated damages. The Authorized User State shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor Subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section.
Appears in 1 contract
Samples: State of Michigan
Withholding for unpaid wages and liquidated damages. The Authorized User Client shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section.
Appears in 1 contract
Samples: Professional Services Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User Participating Agency shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) 2 of this section.
Appears in 1 contract
Samples: do-prod-webteam-drupalfiles.s3-us-west-2.amazonaws.com
Withholding for unpaid wages and liquidated damages. The Authorized User CLIENT shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor CONTRACTOR or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally- assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor CONTRACTOR or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2b) of this section.
Appears in 1 contract
Samples: Is an Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User GovOps shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2C)(b) of this section.
Appears in 1 contract
Samples: files.covid19.ca.gov
Withholding for unpaid wages and liquidated damages. The Authorized User DISTRICT shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally- assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.
Appears in 1 contract
Samples: Independent Contractor Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User Owner shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal Agreement federal contract with the same prime contractorContractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractorContractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor Contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section.
Appears in 1 contract
Samples: Attachment 2
Withholding for unpaid wages and liquidated damages. The Authorized User Owner shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractorContractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractorContractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor Contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2B) of this section.
Appears in 1 contract
Samples: Independent Contractor Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User PROVIDER shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section.
Appears in 1 contract
Samples: Services Agreement
Withholding for unpaid wages and liquidated damages. The Authorized User Owner shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth for in paragraph (b)(2) B of this section.
Appears in 1 contract
Samples: www.sonomawater.org
Withholding for unpaid wages and liquidated damages. The Authorized User Craft3 shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor contractor or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.
Appears in 1 contract
Samples: www.kentwa.gov
Withholding for unpaid wages and liquidated damages. The Authorized User Owner shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor Consultant or subcontractor sub-consultant under any such contract or any other Federal Agreement contract with the same prime contractorConsultant, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractorConsultant, such sums as may be determined to be necessary to satisfy any liabilities of such contractor Consultant or subcontractor subConsultant for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(22) of this section.
Appears in 1 contract
Samples: North Carolina Consulting Contract
Withholding for unpaid wages and liquidated damages. The Authorized User client shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor CONTRACTOR or subcontractor under any such contract or any other Federal Agreement contract with the same prime contractor, or any other federally federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor CONTRACTOR or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2b) of this section.
Appears in 1 contract
Samples: Required Clauses