WEEKLY MAINTENANCE Sample Clauses

The WEEKLY MAINTENANCE clause establishes the requirement for regular, scheduled upkeep of equipment, facilities, or systems on a weekly basis. Typically, this clause outlines the specific tasks to be performed, assigns responsibility for carrying out the maintenance, and may set standards for record-keeping or reporting completed work. By mandating consistent attention to maintenance, the clause helps prevent equipment failures, ensures operational efficiency, and reduces the risk of costly repairs or downtime.
POPULAR SAMPLE Copied 1 times
WEEKLY MAINTENANCE. Using approved standard operating procedures, cleaning materials, and equipment; provide the following services on Tuesday of each week:
WEEKLY MAINTENANCE. The weekly maintenance of the pool will be the responsibility of: (check one)
WEEKLY MAINTENANCE. Item Personnel Level Freq
WEEKLY MAINTENANCE. 40 times per year Scarifying - The top ½” to 1" to loosen this portion of the “dirt.” This can be done with a “nail drag,” and should be done in alternating directions every other week, clockwise then counter clockwise. When scarifying the operator should stay 6" away from the grass edge with the machine and drag, so as not to build up a “lip” of infield dirt along the edge. This 6" area is to be done by hand with a rake. Mat/Fine dragging - This is to be done immediately after scarification. This must be done with a drag designed for fine dragging of infields. This is also to be done in alternating directions every other week. The combination of scarifying and fine dragging will enable the smoothing of the infield to within ½" over 10'. Mound and home plate repair - The mound and home plate areas will show signs of wear, with holes as much as several inches deep. These areas are to be scarified and re-filled with soil from the surrounding area and then tamped firm. Chalking foul (fair) lines - Foul (fair) lines are to be lined each week after dragging. These lines shall be no less than 2" but no greater than 3" wide and true (straight) within ½" over 10' of length. Lines are to extend a minimum of 100' into the grass outfield area.
WEEKLY MAINTENANCE. The weekly maintenance of the pool will be the responsibility of: (check one) ☐ - The Tenant. The Tenant will be responsible for keeping proper water heights, emptying and cleaning skimmers, conducting pool sweeps, and taking the necessary precautions to prevent the freezing of pipes and equipment. All other repairs or costs will be the responsibility of the Landlord. ☐ - The Landlord. The Landlord will be responsible for keeping proper water heights, emptying and cleaning skimmers, conducting pool sweeps, and taking the necessary precautions to prevent the freezing of pipes and equipment.
WEEKLY MAINTENANCE. ▇▇▇.▇▇▇ has a standing scheduled maintenance window every night from 10:00pm until 10:45pm Pacific Time. Regularly scheduled maintenance has the potential for interruptions to the Services and Customer is advised to schedule its activities around this time.