Voltage. When Generator is delivering power to the Georgia Power Electric System, Generator shall operate its generation to meet the voltage schedule, as measured at the transmission bus serving the Facility, communicated by the Georgia ITS operator. The current voltage schedules for the Interconnection Point to the Facility is attached to this Appendix A. If the Generator cannot hold the voltage schedule but is producing or absorbing its maximum amount of MVARs for the level of MW output that it is then operating at, then that is acceptable performance provided that each unit of the Generator that is then generating is producing no less than 0.33 MVAR/MW x the unit's Continuous Rated MW Output or absorbing no less than 0.23 MVAR/MW x the unit's Continuous Rated MW Output. For purposes of this paragraph, the "

Appears in 2 contracts

Sources: Interconnection Agreement (Southern Power Co), Interconnection Agreement (Southern Power Co)