Common use of Voltage Regulation Clause in Contracts

Voltage Regulation. (1) In case the power grid requires reactive optimization, the Power Plant shall adjust according to the reactive load released by the dispatching agency of Pingnan county, and make adjustments whenever necessary. (2) During the operation, in the event that the units have lost the ability of reactive adjustment (or have reached the operation limitation), or the voltage at the testing point has deviated from the quality limit, the Power Plant shall immediately inform the dispatching center, and the dispatcher of the dispatching center shall take relevant measures to maintain the voltage at the testing point within the quality limit. Under the premise of controlling the voltage at the testing point of the Power Plant within the quality limit, if the power grid requires reactive optimization, the Power Plant shall make adjustment according to the reactive load released by the dispatching center. (3) Subject to the needs of adjusting and controlling safety operation of the power grid, the units of the Power Plant must be equipped with AVC and shall be put into operation according to the dispatching instructions of the dispatching center.

Appears in 2 contracts

Sources: Grid Connection and Dispatching Agreement (China Hydroelectric Corp), Grid Connection and Dispatching Agreement (China Hydroelectric Corp)