VAV Boxes Sample Clauses
The 'VAV Boxes' clause defines the requirements and specifications for Variable Air Volume (VAV) boxes used in a building's HVAC system. It typically outlines the performance standards, installation procedures, and quality expectations for these components, such as airflow control capabilities, compatibility with control systems, and necessary testing or commissioning steps. By clearly detailing these aspects, the clause ensures that the VAV boxes installed will provide efficient and reliable temperature regulation, thereby maintaining occupant comfort and energy efficiency while minimizing disputes over equipment quality or installation standards.
VAV Boxes. Provide branch takeoff, hot water piping, and box including electrical connection where deemed prudent.
VAV Boxes. Existing VAV boxes and controls in the Premises will be in good working order. If any work to existing VAV boxes and controls is required to put the same in good working order, Landlord will perform the same in accordance with Section 4 below. Tenant shall be responsible at its costs (and Landlord’s Work will not include) any alterations or additions to VAV facilities required by reason of alterations made to the Premises in connection with the performance of Tenant’s Work.
VAV Boxes. Air terminal Boxes are single Damper Design. New DDC controls are Siemens Apogee Brand. Bottom of thermostats to be 60” AFF typical.
VAV Boxes. All existing VAV boxes serving the Premises will comply with applicable legal requirements and be in good working order and condition upon Landlord’s delivery of the Premises to Tenant. Landlord, at Landlord’s sole expense and not to be deducted from the Finish Allowance, shall perform any repairs required to bring such existing VAV boxes into the foregoing specified condition upon such delivery.
VAV Boxes. Related components and appurtenances including piping, controls, and any other parts required to place major equipment into normal first-class service.
VAV Boxes. DUCTWORK INCLUDING PRIMARY AIR SUPPLY • THE EXISTING SHAFT WALL •
VAV Boxes. 25 VAV boxes, electric heat coils and controls pre-purchased by Landlord on behalf of Tenant.
VAV Boxes. VAV boxes shall utilize DDC controls consistent with the Base Building BMS. Provide specifications for VAV boxes on the Construction Documents. Include manufacturer data, control specifications, minimum and maximum setpoints, and fan setpoint and heating coil information (where applicable). Minimum primary air setpoint shall be zero CFM unless otherwise directed by Landlord. Maximum primary air setpoint shall be scheduled as the quantity required to offset the space sensible load shown in the heat gain calculations.
