Vapor Control System Modifications. For those Vapor Control Systems that are not adequately designed or sized based on the above determination or are found to be emitting VOCs detected with an IR Camera while and immediately after hydrocarbon liquids are being sent to the Tank System from all associated Well Production Operations, [COMPANY] shall: a. Make all necessary modifications to: i. Increase the capacity of the Vapor Control System to handle the Potential Peak Instantaneous Vapor Flow Rate; ii. Reduce the Potential Peak Instantaneous Vapor Flow Rate (as calculated, accounting for modifications); or iii. Ensure Tank System pressures do not exceed the Leak Point. b. Make all necessary modifications to ensure that the control device(s) and vapor recovery unit(s) operate within manufacturer specifications for the device’s size and design.
Appears in 2 contracts
Sources: Audit Program Agreement, New Owner Audit Program Agreement