Unit 5 Sample Clauses

Unit 5. Steam Electric Generating Unit with a nameplate rating of 755 MW described in Exhibit 2 hereto attached.
AutoNDA by SimpleDocs
Unit 5. Tenant shall accept possession of Unit 5 in the condition in which it is received by Landlord, “as is”, without any obligation on the part of Landlord to perform any work in Unit 5 in connection with Tenant’s intended use thereof, save and except that Landlord shall ensure the existing HVAC, electrical, mechanical, plumbing and life safety systems serving Xxxx 0, based on the configuration of Unit 5 as of April 2, 2009, are in good working order as of the Unit 5 Delivery Date and occupancy of Unit 5 by Tenant shall be conclusive evidence against Tenant that, at the time Tenant assumed occupancy, Unit 5 was in good order and satisfactory condition and that Tenant has accepted Unit 5.
Unit 5. Tenant shall accept possession of Unit 5 in the condition in which it is received by Landlord, “as is”, without any obligation on the part of Landlord to perform any work in Unit 5 in connection with Tenant’s intended use thereof, save and except that Landlord shall ensure the existing HVAC, electrical, mechanical, plumbing and life safety systems serving Xxxx 0, based on the configuration of Unit 5 as of the date hereof, are in good working order as of the Unit 5 Delivery Date and occupancy of Unit 5 by Tenant shall be conclusive evidence against Tenant that, at the time Tenant assumed occupancy, Unit 5 was in good order and satisfactory condition and that Tenant has accepted Unit 5. Provided the Lease has been executed by both parties, Tenant agrees to comply with the provisions of and perform the work on its part to be performed pursuant to Tenant’s Work in Schedule “B” attached hereto.

Related to Unit 5

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Completion of Services (a) The Customer must:

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Commercial Operation On or before December 31, 2023, Interconnection Customer must demonstrate commercial operation of all generating units. Demonstrating commercial operation includes achieving Initial Operation in accordance with Section 1.4 of Appendix 2 to this ISA and making commercial sales or use of energy, as well as, if applicable, obtaining capacity qualification in accordance with the requirements of the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region.

  • Completion of Work Contractor is accountable for completing the Work within the Contract Time stated in the Contract, or as otherwise amended by Change Order.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.