Unit 3 Clause Samples

POPULAR SAMPLE Copied 1 times
Unit 3. The third nuclear generating unit at SONGS having at the effective date of this Agreement a Maximum Dependable Capacity (Net) of 1,080 megawatts and consisting of a nuclear steam supply system, a turbine-generator and all related equipment and facilities which are necessary for the safe and efficient generation of electrical energy, including the power circuit breakers, transformer side disconnect switches, conductors, structures, foundations, and dead-end assemblies installed in the Switchyard Area and associated with the Unit 3 main transformer leads, but excluding any of the Common Facilities. Units 2 and 3 include certain facilities that are common to and serve both Units 2 and 3, including radwaste building, auxiliary boiler, and make-up demineralizer.
Unit 3. The third nuclear generating unit at SONGS, consisting of a nuclear steam supply system, a turbine-generator, and all related equipment and facilities which are necessary for the safe and efficient generation of electrical energy including the power circuit breakers, transformer side disconnect switches, conductors, structures, foundations, and dead-end assemblies installed in the Switchyard Area and associated with the Unit 3 main transformer leads and reserve auxiliary transformer leads, but excluding any of the Common Facilities. Unit 3 includes certain facilities that are common to and serve both Unit 2 and Unit 3, including, but not necessarily limited to, the control building, radwaste building, and make-up demineralizer.
Unit 3. 48 Unit 3 Site........................................48 Unit 4.............................................48
Unit 3. Seller will deliver and Buyer will take into the Unit 3 stockpile no less than 45 percent of the total coal received at the Plant during any of the following periods: January 1, 2009 through December 31, 2011; January 1, 2012 through December 31, 2012; provided, however, that if an event of Excuse (as defined in Article VIII) prevents Buyer from using coal in Unit 3, the applicable period shall be extended by a period equal to the duration of the event of Excuse. This provision shall be of no further force or effect as of January 1, 2013, when there will no longer be a Two-Stream Delivery.