Transfer and Operation of Municipal Infrastructure Sample Clauses

Transfer and Operation of Municipal Infrastructure 
AutoNDA by SimpleDocs

Related to Transfer and Operation of Municipal Infrastructure

  • Use and Operation 3.1 Permitted Use ......................................................................................................

  • RELEASE OF GENERAL INFORMATION TO THE PUBLIC AND MEDIA NASA or Partner may, consistent with Federal law and this Agreement, release general information regarding its own participation in this Agreement as desired. Pursuant to Section 841(d) of the NASA Transition Authorization Act of 2017, Public Law 115-10 (the "NTAA"), NASA is obligated to publicly disclose copies of all agreements conducted pursuant to NASA's 51 U.S.C. §20113(e) authority in a searchable format on the NASA website within 60 days after the agreement is signed by the Parties. The Parties acknowledge that a copy of this Agreement will be disclosed, without redactions, in accordance with the NTAA.

  • Variation and Operation Pursuant to and subject to clause 5 of the State Agreement the parties agree to amend the State Agreement in the manner set out in this Agreement.

  • Information Transfer and Storage Supplier will use Industry Standard encryption to encrypt Accenture Data that is in transit. Supplier will also use Industry Standard encryption to restrict access to Accenture Data stored on physical media that is transported outside of Supplier facilities.

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Application and Operation Subject Matter Clause No.

  • Application and Operation of Agreement Clause No. Title

  • Operation and Coordination The ISO shall direct the operation of, and coordinate the maintenance scheduling of, certain facilities of the NYS Power System, including coordination with control centers maintained by the Transmission Owners in accordance with the Reliability Rules, as follows:

  • Ownership and Location of Metering Equipment The Metering Equipment to be constructed, the capability of the Metering Equipment to be constructed, and the ownership thereof, are identified on the attached Schedule C to this ISA.

Time is Money Join Law Insider Premium to draft better contracts faster.