The Late Clause Samples

POPULAR SAMPLE Copied 1 times
The Late. Wisconsinan Laurentide Ice Sheet reached its terminal position south of Block Island at the last glacial maximum, coinciding with the low-stand in eustatic sea level around 26,000 yBP, before beginning to retreat northward (Boothroyd and ▇▇▇▇▇▇, 2002; ▇▇▇▇ et al., 2002; ▇▇▇▇▇▇▇ and Fairbanks, 2006; ▇▇▇▇▇ and Borns jr., 1986). As the glacier retreated, melt-water issuing from the ice deposited sediment in a variety of depositional environments (▇▇▇▇▇▇▇▇▇ and ▇▇▇▇▇▇▇▇▇, 1987; Stone and Stone, 2005) on what is now the southern Rhode Island shoreface and outer continental shelf. Of particular interest to this study are previously identified large glacial deltas, which underlie the modern coastal lagoons and extend south into Block Island Sound (Figure 3). These deltas were deposited into Glacial Lake Block Island sometime before 21,000 yBP (Oakley and Boothroyd, 2013; Oakley, 2012), prior to sea level inundating the study area. Sub-bottom seismic reflection profiles collected by ▇▇▇▇▇▇ (2012) from the present upper shoreface and inner continental shelf showed southerly dipping (5 - 15º) reflectors offshore of the Rhode Island south shore, interpreted to have been deposited in a delta slope depositional environment (Figure 4) (Oakley, 2012), These were hypothesized to contain significant volumes of sand and gravel. Characterizing the location, sedimentology, and volume of these deltas was a primary focus of this study.
The Late. Payment Surcharge shall be governed as per the provisions of Electricity (Late Payment Surcharge) Rules, 2021 issued by Ministry of Power, Government of India vide notification dated 22.02.2021 and subsequent amendments or replacements thereof issued from time to time.
The Late. Usage Discount shall only apply where the late usage hinders the Receiving Party's ability to promptly ▇▇▇▇ its customers.
The Late. Stage Interconnection Facilities Study report (i) shall provide a description, non-binding estimated cost of equipment, engineering, procurement and construction work needed to complete the project, schedule for required facilities to interconnect the Large Generating Facility to the Transmission System and (ii) shall address the short circuit, instability, and power flow issues identified in the Interconnection System Impact Study.
The Late. Usage Discount shall also not apply unless the Receiving Party notifies the Providing Party that it has not received the usage records within five (5) business days of the time the Receiving Party discovers, or should have discovered using reasonable business practices, that it has not received the usage records.
The Late. Registration Payments will be equal to 1% of the purchase price paid for the Common Shares purchased by such Investor and not previously sold by such Investor for each 30 business days after the Required Effective Date (but in no event to exceed 12% in the aggregate). The Late Registration Payments will be prorated on a daily basis during the 30 business day period and will be paid to the Initial Investors by check within five business days after the earlier of (i) the end of the 30 business days following the Required Effective Date or (ii) the effective date of the Registration Statement.

Related to The Late

  • The Specifications The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services.

  • Other Locations Except in the event of an emergency or of a planned System shutdown, the Fund’s access to services performed by the System or to Data Access Services at the Designated Locations may be transferred to a different location only upon the prior written consent of State Street. In the event of an emergency or System shutdown, the Fund may use any back-up site included in the Designated Configuration or any other back-up site agreed to by State Street, which agreement will not be unreasonably withheld. The Fund may secure from State Street the right to access the System or the Data Access Services through computer and telecommunications facilities or devices complying with the Designated Configuration at additional locations only upon the prior written consent of State Street and on terms to be mutually agreed upon by the parties.

  • General specifications For the purpose of this Regulation, the vehicle shall fulfil the following requirements:

  • Workshops During the month of September or October of each year during the term of this Agreement, there shall be held at each University a workshop for Department Chairs at which will be discussed their roles and responsibilities as such. Representatives of the University, at its election, and representatives of the Association, at its election, shall be permitted to participate jointly in such workshop.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.