TESTING - GENERAL Sample Clauses
TESTING - GENERAL. The Contractor shall provide such equipment and facilities as the Architect/Engineer may require for conducting field tests and for collecting and forwarding samples to be tested. Samples themselves shall not be incorporated into the Work after approval without the permission of the Architect/Engineer. All materials or equipment proposed to be used may be tested at any time during their preparation or use. The Contractor shall furnish the required samples without charge and shall give sufficient Notice of the placing of orders to permit the testing thereof. Products may be sampled either prior to shipment or after being received at the site of the Work. Tests shall be made by an accredited testing laboratory. Except as otherwise provided in the Specifications, sampling and testing of all materials, and the laboratory methods and testing equipment, shall be in accordance with the latest standards and tentative methods of the American Society of Testing Materials (ASTM). The cost of testing which is in addition to the requirements of the Specifications shall be paid by the Contractor if so directed by the Architect/Engineer, and the Contract sum shall be adjusted accordingly by Change Order; provided however, that whenever testing shows portions of the Work to be deficient, all costs of testing including that required to verify the adequacy of repair or replacement Work shall be the responsibility of the Contractor.
TESTING - GENERAL. The City may require testing to satisfy itself of contract compliance or as required by law or any public jurisdiction having authority. The CM/GC shall provide such equipment and facilities as the City may require for conducting field tests and for collecting and forwarding of samples. The CM/GC shall not use any materials or equipment represented by samples until tests, if required, have been made and the materials or equipment found to be acceptable. Any materials which become unfit for use after approval thereof shall not be incorporated into the Work. All materials or equipment proposed to be used may be tested at any time during their preparation or use. Products may be sampled either prior to shipment or after being received at the site of the Work. All testing shall be performed by an independent testing laboratory or entity acceptable to and paid for by the City. All re-tests on account of failed tests shall be paid for by the CM/GC.
TESTING - GENERAL. The Design/Build Entity shall provide such equipment and facilities as the Design Build Entity’s Architect/Engineer or Principal Representative may require for conducting field tests and for collecting and forwarding samples to be tested. Samples themselves shall not be incorporated into the Work after approval without the permission of the Design Build Entity’s Architect/Engineer and Principal Representative. All materials or equipment proposed to be used may be tested at any time during their preparation or use. The Design/Build Entity shall furnish the required samples without charge and shall give sufficient Notice of the placing of orders to permit the testing thereof. Products may be sampled either prior to shipment or after being received at the site of the Work. Tests shall be made by an accredited testing laboratory. Except as otherwise provided in the Specifications, sampling and testing of all materials, and the laboratory methods and testing equipment, shall be in accordance with the latest standards and tentative methods of the American Society of Testing Materials (ASTM). The cost of testing which is in addition to the requirements of the Specifications shall be paid by the Design/Build Entity if so directed by the Principal Representative, and the Contract sum shall be adjusted accordingly by Change Order; provided however, that whenever testing shows portions of the Work to be deficient, all costs of testing including that required to verify the adequacy of repair or replacement work shall be the responsibility of the Design/Build Entity.
