Test Scenario Sample Clauses

Test Scenario. ‌ The test environment is the same as the one in Figure 21, which was used in Active Tag Network Construction Delay test. But in this test, only single ARTag is connected to 6LoRAs. In this structure, we’ve measured the delay of RFSurvey for a single ARTag with given EPCID.
Test Scenario. Currently the lines in the pilot are oversized with respect to the demand and generation it hosts, and consequently real critical events are not expected. Given this situation, critical events have been generated artificially by downsizing the ampacity parameter of specific line in the pilot. This allows creating artificially critical events associated to a congestion in the specified line segment without affecting the normal operation of the grid. At the same time, this strategy reduces uncertainty during the evaluation since the real location of the supposed congestion is known. The proposed test scenario is represented in the Figure 23. The red segment represents the relative position of the weakest part of the grid with the selected configuration set at [011] with all the load and generation connected to the same substation SS-B (SS030). The segment labelled as 155722 corresponds to the real segment which ampacity has been substantially reduced to, in somehow, simulate a thinner line. Switchgear configuration code corresponds to the triplet (SG1, SG3, SG2) and values represent 1/0 (closed/open).
Test Scenario. 1: LAN PC Conference - Create a conference room and join the room with 10 PC participants on a LAN - Talk among the 10 participants and validate that the audio quality is consistent with that of a G.723.1 codec - View participants in a conference room and see who are speaking