Test interpretation. The maximum allowed volume increase is 5 per cent. The container shall meet the requirements of the external leak test as defined in paragraph 2.4.3. of this annex and the burst test as defined in paragraph 2.2. of this annex. 2.3.6.6.4. Retesting Retesting is permitted for the high temperature creep test. A second test shall be performed on two containers which have been produced successively to the first container within the same batch. If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected.
Appears in 4 contracts
Samples: unece.org, unece.org, tind-customer-undl.s3.amazonaws.com
Test interpretation. The maximum allowed volume increase is 5 per cent. The container shall meet the requirements of the external leak test as defined in paragraph 2.4.3. of this annex and the burst test as defined in paragraph 2.2. of this annex. 2.3.6.6.4. Retesting Retesting is permitted for the high temperature creep test. A second test shall be performed on two containers which have been produced successively to the first container within the same batch. If the results of these tests are satisfactory, the first test shall be ignored. In the event where one or both of the retests fail to meet the requirements, the batch shall be rejected.β Paragraph 2.5., amend to read:
Appears in 1 contract
Samples: digitallibrary.un.org