Temporary Solution Sample Clauses

Temporary Solution. A temporary solution is defined as a measure to suspend the current behavior. It may take the form of a workaround, patches, or an alternative design approach. Implementing a temporary solution may lower the priority of a problem by one level.
Temporary Solution. For the period before the final handover of the above-mentioned parts of the subject of performance, these will be replaced by a free loan of a demonstration sample of CCD camera with similar parameters.

Related to Temporary Solution

  • Temporary Roads As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Purchaser shall employ such measures as out- sloping, drainage dips, and water-spreading ditches.

  • Temporary Upgrade An employee in a temporary upgrade status shall have no right to grieve or arbitrate release from such temporary upgrade status.

  • Temporary Layoff The Employer may temporarily layoff an employee for up to ninety (90) days due to an unanticipated loss of funding, revenue shortfall, lack of work, shortage of material or equipment, or other unexpected or unusual reasons. An employee will normally receive seven (7) days notice of a temporary layoff.

  • Temporary Suspension JetBrains reserves the right to suspend Customer’s access to JetBrains Products if Customer or User’s use of Product is in violation of this Agreement or disrupts or imminently threatens the security, integrity, or availability of a Product.

  • Temporary Work 3.4.1 The Contractor shall have the sole responsibility for the design, erection, operation, maintenance, removal and repair of Temporary Work. 3.4.2 The Contractor shall engage and pay for registered professional engineering Personnel skilled in the appropriate disciplines to perform those functions referred to in GC 3.4.1 where required by Laws or by the Agreement and in all cases where such Temporary Work is of such a nature that professional engineering skill is required or prudent to produce safe and satisfactory results. 3.4.3 Notwithstanding the provisions of 3.1 - CONTROL OF THE WORK, GC 3.4.1 and