System Evaluation Clause Samples
System Evaluation. The independent certification function of DQS will evaluate the audit process and its results, and decide independently about issuance of the certificate. The client receives an audit report, documenting the audit results. When all applicable requirements are fulfilled the client also receives the certificate.
System Evaluation. The Independent certification function of BQAS (Technical/Peer Reviewer) will evaluate the assessment process and its results, and recommend independently issuance of the
System Evaluation. The water supply and storage systems of the overall Village were evaluated for adequacy using six (6) parameters which generally rate the strength of the supply and storage systems. The parameters used for supply and treatment are as follows:
System Evaluation. The Consultant shall evaluate sewer system capacity both under existing and future (2045) conditions utilizing the updated and calibrated hydraulic model (developed in Task 5) and the planning criteria (developed in Task 4). The Consultant shall evaluate the sewer capacity under dry weather conditions by conducting steady state an extended period (continues 24-hour) simulation to evaluate the system under all flow (low and peak) conditions. For all sewer pipes, model flow rates, flow depth to diameter ratios (D/d), and velocities for average and peak dry weather flows. The Consultant shall evaluate the sewer capacity under wet weather conditions for a 2-year, 10-year, and 25-year storm. Based on the modeling results, the Consultant shall: • Identify the sewer pipes that do not meet the planning and design criteria. • Identity locations in the sewer system that have capacity constraints under peak wet weather flow. • Identify areas in the City with high rates of Infiltration and Inflow (I&I). • Produce maps/tables showing the sewer pipes that do not meet the planning and design criteria. Facilities not meeting planning criteria in the model shall be flagged with a user-defined field explaining the reason. Additional/future facilities input into the model shall be flagged as future facilities for easy tracking and identification in tables and figures. The City has two sewer connections with the City of Norco. The Consultant shall account for these connections and the associated agreements for mutual support and describe and present the information. The Consultant shall provide training to City staff on how to run the model, update the model by incorporating new facilities, and evaluate the system under various scenarios.
