Common use of System Acceptance Testing Clause in Contracts

System Acceptance Testing. (a) Provider shall conduct testing of the System equivalent or superior to the CEC “Guide to Photovoltaic (PV) System Design and Installation” as follows: (1) String-level testing for all PV strings. (2) Inverter testing for all inverters. The inverters will be commissioned on site by a qualified technician and will confirm that the inverter can be operated locally per specification and that automatic operations such as wake-up and sleep routines, power tracking and fault detection responses occur as specified. (3) Testing of all System monitoring sensors. (4) After Provider conducts all testing set forth above, Provider will submit a detailed test report to Purchaser for review. The test report shall include all documentation of the Acceptance Testing and shall state all testing methods and methodologies used, any standards (such as ASTM and NFPA 70) used, all data collected, and complete analysis and results, as set forth below: (i) Detailed test methods, including sample calculations and reference to standards as required or applicable, and list of tested equipment. (ii) Pre-test checklist to ensure readiness and any safety measures are in-place. (iii) Details of all necessary adjustments, balancing, required equipment isolation or configuration, test equipment and instruments, calibration, and personnel needed.

Appears in 3 contracts

Sources: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement