Survey Phase Clause Samples
Survey Phase. After Client approves the final master plan, Consultant will commence work within fourteen (14) calendar days after acceptance of the general sewer alignment.
Survey Phase. 1. Engineer shall coordinate with Owner’s representative and identify areas to be renovated/demolished/cleaned.
2. Engineer shall review available information, including all documents for the original facilities; any subsequent renovation work and previous asbestos and regulated building material survey reports.
3. Engineer shall afford Key Personnel to sample, analyze, photograph, and document locations, and quantities of materials suspected of containing asbestos, lead or other regulated building materials. Should Key Personnel not be available, the Engineer shall provide qualified personnel to perform work at the Work Authorization/Project Proposal Phase. The Owner reserves the right to request resumes and experience documentation in accordance with the RFQ, prior to any new personnel being approved to Work under this Agreement.
4. The asbestos-related work shall conform with the requirements for a Good Faith Inspection as required by Washington State Department of Labor and Industries’ Division of Occupational Safety and Health (DOSH) and an asbestos survey for the local clean air agency, and follow the sampling requirements of Asbestos Hazard Emergency Response Act 40 CFR 763.86 (AHERA).
5. Engineer shall document findings in a Regulated Building Materials Survey Report that includes, but is not limited to, the results of the Good Faith Inspection for asbestos.
6. If requested by the Owner, Engineer shall provide Owner with a preliminary rough order of magnitude estimate of abatement costs.
7. Engineer shall identify any area requiring immediate abatement action, notify Owner’s representative within 24 hours, and provide an estimate of its abatement cost.
8. Engineer shall identify areas requiring destructive testing, and coordinate with owner for such testing and repair of test areas.
9. Engineer shall identify possible regulated building materials that may be encountered during demolition or construction and could not be investigated during the survey.
Survey Phase. The Plan Review Process begins during the Survey Phase. The Survey is initiated once an Authorization To Proceed is issued.
Survey Phase. After Client approves concept plan, Consultant will commence work within fourteen (14) calendar days after acceptance of the general sewer alignment.