Supplier and Subcontractor Quality Sample Clauses

Supplier and Subcontractor Quality. The Quality Plan (QP) identifies Equipment subject to shop surveillance under the direction of the Vendor’s designated project supplier quality supervisor (PSQS). Vendor’s PSQS shall prepare a Quality Plan (QP) (see Reference A-1 of this Scope of Work document) designating the equipment and the specific inspections that the Vendor intends to make in supplier and subcontractor shops for this Plant. The QP shall also specify the frequency and sequence of visits for surveillance and testing of subcontractor equipment and work. To the extent that maintenance activities are required for the Equipment provided, Vendor will submit Site Storage and Storage Maintenance instructions describing the maintenance or handling required relative to their individual FCA shipment dates to ensure that Bechtel has required information to store and maintain Vendor’s Equipment upon Delivery. As prescribed in the QP, the PSQS shall direct the activities performed by supplier quality representatives (SQRs), including: • Visiting supplier/subcontractor shops to confirm that work is in accordance with the most current requirements of the PO/subcontract and the technical specifications • Verifying witness and hold points (Bechtel shall be notified two weeks in advance of witness and hold points and may participate in verification of these points, if desired. However, ▇▇▇▇▇▇▇’▇ participation shall not impede the progress of the work.) • Reviewing and inspecting subcontractor personnel qualifications, workmanship, material, and procedures • Examining purchased/subcontracted items during fabrication to determine compliance with quality requirements and applicable codes and industry standards • Verifying critical dimensional measurements and reviewing documentation on an audit basis in accordance with specifications, applicable codes, industry standards and as agreed between Vendor and its suppliers • Verifying that supplier/subcontractor documents have been prepared in accordance with the contractual requirements • Releasing for shipment Equipment that has been verified as being satisfactory and checking that shipping and packing requirements have been met (verification and checks to be conducted on a sampling basis) • Preparing necessary Quality Reports to document surveillance visits when a formal audit is performed or if requested by Bechtel in advance (QRs) The PSQS shall also be responsible for: • Reviewing PO’s, subcontracts, and specifications to identify quality requirements • P...