Sundries Clause Samples

Sundries. 4 Create earth berm for stormwater control with in situ material 1,5m wide at base x 500mm high m 60 m 60 Section 3 Bill No. 3 Stormwater Drainage
Sundries. Halcast or equal similar approved"
Sundries. An account for sundries will be billed December 15th, April 15th, and June 30th (e.g., LCC Store, stationery, photographs, student trips, music fee, yearbook, online library subscriptions and exam fees where appli- cable, misc., etc.)
Sundries. 12 Extra over excavation in earth for pipe trenches, ▇▇▇▇▇▇▇▇, etc for excavation in hard rock m3 3 13 Standard pre-cast concrete ▇▇▇▇▇▇ sorround No 6 14 457 x 457 x 50mm Precast concrete inspection eye marker slab set in ground No 6 15 110mm uPVC "ABC" cleaning eye including type 11B cast iron cover and frame No 12 16 Cutting into existing 110mm drain pipe for and forming junction with 110mm pipe No 1 17 Testing soil drainage pipe system RAINWATER DISPOSAL "Marley Streamline" uPVC Item 18 110mm Half round ▇▇▇▇▇ gutters m 218 Section 2 ▇▇▇▇ No. 13 Plumbing and Drainage 19 Extra over ▇▇▇▇▇ gutter for angle No 28 20 Extra over ▇▇▇▇▇ gutter for stopped end No 8 21 Extra over ▇▇▇▇▇ gutter for outlet for 80mm diameter pipe No 44 22 80mm Diameter rainwater pipes m 132 24 Extra over rainwater pipe for ▇▇▇▇▇ or plinth offset 450mm projection No 44 25 "Rondo RDX610-44" prep bowl 405mm diameter x 145mm deep No 1 26 "WB001" wash hand basins 520 x 420mm wide ▇▇ ▇ ▇▇ "▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇" sink and drainer 860 x 435mm wide with one bowl No 7 28 "Grade 304 18/10" polished stainless steel centre double bowl drop on sink (Code: 312081), size 1200 x 535mm wide with two 343 x 410 x 169mm deep bowls, fitted onto cupboard (elsewhere specified) including 38mm waste fittings and PVC traps (traps elsewhere specified). Sink guaranteed for 25 years against corrosion and supplied with protective plastic coating for transport and handling and to be removed once sink is made operational. No 4 29 "Luxtub LDL" wash trough 500 x 600mm wide ▇▇ ▇ ▇▇ "▇▇▇▇" ▇▇▇▇▇ baby bath 915 x 550 x 150mm deep No 1 31 "CH" Slophopper 540 x 540mm with grid (flushing valve elsewhere) No 2 32 "EC" combination bedpan and wash up sink and drainer 1 830 x 685mm wide including "Cobra" FM1.00 flushvalve, "CP171/041" pillar mixer with overarm swivel spout, "CP297" pillar mixer with retractable hand spray, 15mm bedpan spray nozzle and 15mm bottle spray nozzle No 1 Section 2 ▇▇▇▇ No. 13 Plumbing and Drainage 33 "Hibiscus 7050" 510 x 405mm white basin with two tapholes No 19 34 "Sola 610" 610 x 460mm white medical basin (no tapholes) No 19 35 "Pearl paraplegic 7300SC" semi closed coupled wc suite comprising pan with double flap heavy duty plastic seat and matching 9 litre cistern with purpose made side flush lever No 2 36 "Hibiscus 772654" close coupled wc suite comprising pan with double flap heavy duty plastic seat and 6/3 litre duel flushing cistern No 15 37 "Lavatera 705427" wall urinal with spreader (flushing valve ...
Sundries plated steel leaf spring door holder with rubber door stop plugged and screwed to floor No 16.00
Sundries. Diameter rubber door stop plugged No 3 Section No. 2 Bill No. 9 Ironmongery R
Sundries. Rubber stop plugged and srewed to wall or floor. No 4
Sundries. 8 Female SHE BIN plugged to walls No 1 SMF3 BLOCK Bill No. 7 IRONMONGERY
Sundries. 19.1 If in one or more cases any of the Parties fails to invoke or insist on compliance with any of the provisions under the Agreement or to exercise any of the rights awarded under the Agreement, such omission or failure to insist will not be construed as a waiver of such provision or rights. 19.2 In executing the Operations, the Contractor will comply with all the decisions made by competent authorities in the exercise of their legal mandate. Likewise, the Contractor commits to honor all the decisions of competent authorities relating to national defense and security. 19.3 The Contractor has the right to freely enter and leave the Agreement Area. 19.4 Pursuant to legislation in force, the Contractor will have the right to utilize in the Operations, the water, wood, gravel and other construction materials found within the Agreement Area with due respect for third parties rights as appropriate. 19.5 The license to use technical information concerning the Agreement Area, and other areas, which the Contractor may wish to purchase from PERUPETRO, will be granted pursuant to PERUPETRO’S policy for Managing Exploration and Development Technical Information for which purpose the Parties will sign a Letter of Agreement. 19.6 If one of the Parties fails to pay, within the agreed deadline, the amount due, it will pay following interest trade starting on the day after the date foreseen for that payment: a) For debts payable denominated in domestic currency, the applicable rate will be the active rate in domestic currency (TAMN) for loans with tenure up to three hundred sixty (360) days as published by the Superintendence for Banking and Insurance Companies or its successor, and applied over the period elapsed between the due date and the actual payment date; and, b) For debts denominated in dollars, and payable in domestic currency or in dollars, the applicable rate will be the U.S. Prime Rate plus three percent (3%) points published by the Federal Reserve of the United States of America, applied to the period running from the due date to the actual date of payment, and in the absence of the latter rate, the Parties will agree on an appropriate replacement. 19.7 The provisions under heading 19.6 will apply to all debts between Parties flowing from this Agreement or any other agreement or transaction between the Parties. By written agreement between the parties, a different provision may be introduced concerning the payment of interest. The provisions herein applicab...
Sundries. 97 Extra over excavation in earth for pipe trenches, ▇▇▇▇▇▇▇▇, etc for excavation in soft rock m3 4 302.00 98 Extra over excavation in earth for pipe trenches, ▇▇▇▇▇▇▇▇, etc for excavation in hard rock m3 2 845.00