Streams/Wetlands Sample Clauses

Streams/Wetlands. For Planning Area 1, the extent of development will be approximately as shown on PCI Plan Sheet SP-2. Development in Planning Area 1 does not impact streams or wetlands. Some development will occur within stream or wetland buffers, approximately as shown on PCI Plan Sheet CA-1. These buffer impacts are allowed by SMC 19.12.160.C, SMC 19.12.170.H, 19.08.560.B, and SMC 17.20.050.I and/or were approved in connection with the PCI Plan approval. Development within Planning Areas 2 and 3 will comply with applicable Development Regulations relating to any proposed alterations to streams and wetlands, including SMC 19.12.160 and 19.12.170.
AutoNDA by SimpleDocs

Related to Streams/Wetlands

  • Wetlands When disposing of excess, soil, or other construction materials on public or private property, Contractor shall not fill in or otherwise convert wetlands.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Wildlife Do not feed any of the wildlife ever. Animals of any size are potentially dangerous. Feeding even small animals attracts predators. Supervise children at all times. Keep garage doors closed at all times except when entering or leaving the Rental Home.

  • WATERBEDS The Tenant: (check one) ☐ - Shall have the right to use a waterbed on the Premises. ☐ - Shall not have the right to use a waterbed on the Premises.

  • Water Provide hot water for lavatory purposes and cold water for drinking, lavatory and toilet purposes.

  • Routes All bus stops and bus routes will be mutually agreed upon prior to the start of the school year. Additional stops will be not be added until approved by SSAS and reviewed for safety and approved by the School Board’s Transportation Department. Route changes, if approved, will require 7 calendar days from the date of request to the date of implementation. Special needs transportation requests must be made a minimum of 14 days prior to the requested date of implementation.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

Time is Money Join Law Insider Premium to draft better contracts faster.