Storm Water Data Report Clause Samples
POPULAR SAMPLE Copied 1 times
Storm Water Data Report. Stantec will update the PSR-PDS Storm Water Data Report (SWDR) for the two (2) build alternatives in conformance with current Caltrans requirements in the latest Caltrans guidelines set forth for the PA/ED phase. The SWDR is to include the following information: Project description, identification of the receiving water bodies, geotechnical information, design pollution prevention and post-construction BMPs proposed, costs, and checklists. The SWDR will be signed by the Project Engineer, the District/Regional Design Storm Water Coordinator, the designated Landscape Representative, and approved by the Project Manager to verify that storm water quality design issues have been addressed, and the data is complete, current, and accurate. • Draft/Final SWDR for PA/ED
Storm Water Data Report. CONSULTANT shall update the SWDR prepared in the PID phase in accordance with Caltrans SWDR guidelines. Preparation of the SWDR will define the appropriate types of Best Management Practices (BMPs) for the Project including costs for the BMPs and identify additional right of way to accommodate temporary and permanent BMPs.
Storm Water Data Report. CONSULTANT will update the Storm Water Data Report to include the revised project area associated with the design variations, the revised project costs, and the revised project schedule. Additionally, the Storm Water Data Report will be updated in conformance with current CALTRANS requirements in the CALTRANS Project Planning and Design Guide (February 2016). Per CALTRANS comments received on July 10, 2015, the Storm Water Data Report will be updated after circulation of the Draft Environmental Document and selection of a Preferred Alternative.
Storm Water Data Report. The Storm Water Data Report will be deferred to final design. Corresponding fees will be reallocated to remaining tasks.