STANDARDS General Sample Clauses

STANDARDS General. The following list of Standards are included for information purposes only, and as a guide to the relevant standards for the general nature of the work identified as Footpath Works in this document. The City makes no representation or warranty as to the currency of the standards identified, or their application on the final design of the Footpath Works. The Developer must make its own enquiries regarding whether any standard has been replaced or supplemented.
STANDARDS General. 9.1 All work must be carried out in a professional manner and the site left tidy with all unused materials being removed on completion. 9.2 The contractor will be responsible for the safe keeping of machinery and equipment for the duration of the contract. 9.3 To minimise the risk of site contamination, special care will be taken when refuelling machinery or replenishing machine lubricants. 9.4 Such work will be carried out away from areas of open water or watercourses, drains and soakaways. 9.5 As the public can be present in the vicinity, special care must be taken to ensure that all gates are left as they are found and that no machinery, equipment or materials are stored on the site in such a way that it presents a hazard to the public. 9.6 The Contractor shall make good any damage caused to roads, tracks, fences, walls, gates, gateposts, bridges and culverts, and all other property of Natural England, its tenants and licensees. 9.7 All litter arising from the work shall be removed from the site.